background image

Step 3  

Wiring  

Select the wiring diagram 

through 

below that corresponds to the 

low water cut-off installed on the boiler.

Consult boiler manufacturer’s instructions for proper burner terminal connections.

Note: 

If there is no jumper installed on the low water cut-off

between 1 and P1, see 

ALTERNATE WIRING

box.

Note: 

If there is no jumper installed on the low water cut-off

between H and C, see 

ALTERNATE WIRING

box.

Note: 

If there is no jumper installed on the low water cut-off

between 2 and P1, see 

ALTERNATE WIRING

box.

Note: 

If there is no jumper installed on the low water cut-off

between 1 and 3, see 

ALTERNATE WIRING

box.

Hydrolevel

McDonnell & Miller 

Float Style Control

Honeywell

PS-800 Series

– Older Models

STANDARD WIRING

Safgard Model OEM-24TD

STANDARD WIRING

IMPORTANT

To prevent over-feed-

ing and possible

flooding, when used

with the OEM-24TD,

the VXT should be set

with a Feed Delay of

10 minutes and a

Feed Amount of 1 to 5

gallons (see step 5). 

DO NOT USE LWCO

SETTING.

ALTERNATE WIRING

Safgard & CycleGard Models: 

If there is no jumper installed between terminals 1 and P1 on the low cut-off
(between 2 and P1 on Model OEM-24TD), then the cut-off is powered by a
separate power source from the burner circuit and the following wiring must
be used:

Connect a wire from the FEED terminal on the feeder to the A

terminal on the cut-off. 

Connect a wire from terminal H on the feeder to

the  burner  circuit  hot. 

Connect  a  wire  from  terminal  N  on  the  feeder  to

burner circuit common.

ALTERNATE WIRING

PS-800 Series: 

If there is no jumper installed between terminals H and C on the low water
cut-off (terminals 1 and 3 on older models), then the cut-off is powered by a
separate power source from the burner circuit and the following wiring must
be used: 

Connect a wire from the FEED terminal on the feeder to the W

(4 on older models) terminal on the cut-off. 

Connect a wire from terminal

H on the feeder to the burner circuit hot. 

Connect a wire from terminal N

on the feeder to burner circuit common.

Using a separate power source for the feeder

Model RW-700 Guard Ring

Using the burner circuit to power the feeder

Safgard Model 400 / CycleGard CG400

STANDARD WIRING

PS-800 Series

– Newer Models

STANDARD WIRING

Summary of Contents for VXT-24

Page 1: ...EED COUNTER page 4 UNDERFEED PROTECTION page 4 LOCKOUT FLOOD PROTECTION page 4 INSTALLATION WARNING To prevent electrical shock or equipment damage power must be off during installation or servicing of the control To pre vent serious burns the boiler should be thor oughly cooled before installing or servicing control Only qualified personnel may install or service the control in accordance with lo...

Page 2: ...d CycleGard Models If there is no jumper installed between terminals 1 and P1 on the low cut off between 2 and P1 on Model OEM 24TD then the cut off is powered by a separate power source from the burner circuit and the following wiring must be used Connect a wire from the FEED terminal on the feeder to the A terminal on the cut off Connect a wire from terminal H on the feeder to the burner circuit...

Page 3: ... system on and the thermostat off lower the water level to approximately 1 2 below the probe 2 Press the FEED button on the water feeder and using a watch with a second hand time how long it takes boiler water to reach the normal operating level Usually the middle of the gauge glass unless otherwise specified by the boiler manufacturer 3 Round the time to the nearest minute and set the feeder for ...

Page 4: ...ner shows signs of mineral deposits collect ing on the screen install a Hydrolevel Feed Valve Service Kit Part No 45 345 Every 3 Years Install Hydrolevel Feed Valve Service Kit Part No 45 345 Note If hardened calcium deposits have formed on the brass surface inside the valve replace the valve Part no 45 343 12 Years Replace the VXT Series Water Feeder after 12 years of service Diagnostics Trouble ...

Reviews: