background image

LIMITED MANUFACTURERʼS WARRANTY

We warrant products manufactured by Hydrolevel Company to
be free from defects in material and workmanship for a period
of two years from the date of manufacture or one year from
the date of installation, whichever occurs first. In the event of
any claim under this warranty or otherwise with respect to our
products which is made within such period, we will, at our
option, repair or replace such products or refund the purchase
price paid to us by you for such products. In no event shall

Hydrolevel Company be liable for any other loss or damage,
whether direct, indirect, incidental or consequential. This war-
ranty is your EXCLUSIVE remedy and shall be IN PLACE OF
any other warranty or guarantee, express or implied, includ-
ing, without limitation, any warranty of MERCHANTABILITY or
fitness for a particular purpose. This warranty may not be
assigned or transferred and any unauthorized transfer or
assignment thereof shall be void and of no force or effect.

83 Water St. • New Haven, CT 06511 • Phone: (203) 776-0473 • FAX: (203) 773-1019 •

www.hydrolevel.com

DIMENSIONS

SPECIFICATIONS

VOLTAGE

120 VAC, 60 HZ

BURNER CONTACTS

5.8 FLA, 34.8 LRA, 125 VA pilot duty @ 120 VAC, 60 HZ

MAX PRESSURE

160 PSI

MAX WATER TEMPERATURE

250°F (121°C)

Model 1150 Instructions: Model 1150 Instructions  9/24/10  9:17 AM  Page 2

Summary of Contents for Safgard 1150

Page 1: ...or pipe Do not install in a location that could hold or trap water in the event of a low water condition Remove center extended nut Apply pipe sealing compound to probe threads and install in boiler or tee Tighten so that the two smaller extended nuts are horizontally aligned Mount the control box on the probe by aligning the keyhole slots with the two extended nuts Replace the center extended nut...

Page 2: ...20 VAC lead coming from the service switch Step Connect the second yellow wire CUT OFF from the Safgard 1150 to the L1 boiler connection Connect the black wire H from the Safgard 1150 to the hot 120 VAC lead coming from the service switch Connect the white wire N to the neutral 120 VAC lead Locate and break into the burner circuit Connect the yel low wires CUT OFF from the Safgard 1150 in series w...

Page 3: ...er should shut down 5 YEARS Remove the low water cut off every five years and clean all surfaces in contact with water TROUBLE SHOOTING IF THE BURNER DOES NOT SHUT DOWN when water is below the probe or when the TEST button is pressed 1 Turn off boiler power immediately and re check wiring 2 Turn off boiler power and drain system Remove low water cut off and check for adequate clearance no metal sh...

Page 4: ...y other loss or damage whether direct indirect incidental or consequential This war ranty is your EXCLUSIVE remedy and shall be IN PLACE OF any other warranty or guarantee express or implied includ ing without limitation any warranty of MERCHANTABILITY or fitness for a particular purpose This warranty may not be assigned or transferred and any unauthorized transfer or assignment thereof shall be v...

Reviews: