![hydrofuse Fertilizer Machine V1.3 Installation Manual Download Page 9](http://html1.mh-extra.com/html/hydrofuse/fertilizer-machine-v1-3/fertilizer-machine-v1-3_installation-manual_2192164009.webp)
7
Installation in a straight section of mainline pipe but with a pair of quick disconnects to allow the Flow
Sensor and Injection Point to be removed if necessary
When assembling PVC fittings use appropriate cement for the type of irrigation tubing you have. PVC plastic
is the most common but there are other types so check what your system has before buying extra fittings and
cement. Follow instructions on cement bottle to ensure correct joints.
5. Fitting the Injection Point –
Apply Teflon tape then screw the reducer into the T fitting you installed in
the irrigation main line. Again, apply Teflon tape then screw the grey Check Valve into the reducer and
tighten with reasonable force. Connect one end of the 20’ length of tubing by pushing it firmly onto the end
of the check valve inside the blue band.