OLF 10/2
Installing the OLF
Installing the OLF
During installation, make sure that the direction of flow through the filter is correct. The
connections are marked with IN / OUT. Only install the filter when it is in an upright
position.
The OLF is designed for installation in a pipeline or hose line with a G1/2" threaded
connector (cylindrical pipe thread in accordance with DIN ISO 228; part 1).
Make sure that no stresses or vibrations are transmitted to the filter housing. Use
hoses or expansion joints if necessary.
Before installation, coat the connector threads with a lubricant containing
slip additives.
This prevents damage to the connector threads during installation.
Lubricant containing a slip additive (MoS
2
) = HYDAC p/no.: 3066287
Make sure there is sufficient room (A) to
change the filer element.
Perform installation work in the
immediate vicinity of the filter housing
shut-off valves (B). This facilitates
changing the filter element.
A
B
IN
OUT
B
HYDAC Filter Systems GmbH
en
Page 17 / 32
BeWa OLF10-2-TV 3494386 en 2009-09-16.doc
2009-09-16
Summary of Contents for OLF-10/2
Page 30: ...Notes ...
Page 31: ...Notes ...