Prior to switching the unit on
HYDAC FILTER SYSTEMS GMBH
en
Page 33 / 68
BEWA ALPC9000 3601005 en 2011-04-07.doc
2011-04-06
Prior to switching the unit on
Before switching the ALPC on, proceed through the following steps:
1.
Check the flushing fluid tank for sufficient stocks of flushing fluid.
2.
Check the suction hose. The suction hose must be located in the flushing
fluid and may not draw in any air.
3.
Empty the flushing return tank.
4.
Check the return hose. The return hose must be located in the return tank.
5.
Check all hoses for leaks and screw connections for signs of leakage.
6.
Empty the collecting pans.
If there is a lot of fluid located here, this may be an indication of leakage.
7.
Check the O-ring on the pressure dome as described on page 48.
8.
Clean the sealing disk on the vacuum hand as described on page 54.
9.
Check the position on the EMERGENCY STOP switch (see page 28)
10. Check the switch positions on the robot controller (see page 30).
11. Check the maintenance unit (9).
Switch the compressed air for module V1 on.
Check the pressure on the pressure gauge. At least 6 bar are required for
operation.
Drain any condensate / oil on the modules FR and FF.
12. Check the pressure dome position.
If the pressure dome is located in the upper position, you can continue with
Step (13).
If the pressure dome is located in a intermediate position, switch on the
output (A003 -
move dome upward
) manually via the ALPCDesk software on
I/O mode, and the pressure dome will move into the required upper position.
13. The preparations for switch-on have been completed.
Continue to Chapter "Switching on the ALPC“ on page 34.