Required:
Boosters must have
dedicated disc type discharge check
valve rated for working pressure.
Units with multiple Boosters must
have multiple check valves.
NOTE:
In-tank discharge check
valve(s) are shipped loose for local
installation.
Required:
Control panel must have
36” clearance or local regulation
requirement, whichever is furthest.
Recommended:
Booster should
be placed with at least 18” distance
between other components for
serviceability and air circulation.
7. Discharge Receiver and Check Valve
Required:
A clean discharge
receiver tank must be placed
immediately after the booster.
Recommended:
Tank size should
be 2 gallon per scfm. Manual ball
valves should be placed on either
side of discharge receiver to enable
service isolation. Tank should be
placed within 20’ of the booster.
36”
18”
10”
16”
18”
3”
5”
18”
Service Distance