Required: 

The use of a minimum 

1  micron  filter  is  required  prior  to 

the suction receiver. Filter must be 

rated  for  twice  the  full  flow  of  the 

booster.  If  specified,  a  pressure 

regulator is also required.

Recommended: 

Manual ball valve 

should be placed on either side 

of  filter  and  pressure  regulator  to 

enable service isolation. 

See “Suction Piping and Filtration” 

section

2. Suction Filtration

3. Suction Receiver

Required: 

A clean suction receiver 

tank must be placed immediately 

prior to the booster.  

Recommended: 

Suction tank 

size should be 1 gallon per scfm. 

Manual ball valves should be 

placed on either side of suction 

receiver to enable service isolation. 

Tank should be placed within 10’ of 

the booster.

See “Receivers” section

4. Suction / Discharge Pressure Sensing Lines

Required: 

Pressure sensing lines 

must be run directly to respective 

tanks. Piping must be no smaller 

than 3/8”.

 Pressure sensing 

lines must be rated for working 

pressure of system
Recommended: 

Manual ball valve 

should be placed on both suction  

and discharge pressure sensing 

lines to enable service isolation. 

1. Installation to Floor

Required: 

Cement pad on solid 

bedrock, packed earth, or gravel 

required. Booster must be level, 

with 100% contact to mounting 

surface. Wedge anchors may not 

be used. 

Recommended: 

Use of “J” bolts or 

MaxiBolts. 

See “Foundation” section for pad 

weight and dimensions

Summary of Contents for DS015

Page 1: ...Odyssey Easy Installation Guide...

Page 2: ...ose q Nitrogen Boosters must have an suction receiver sized per Receivers section of this manual Ensure that suction and discharge receiver tanks are secured and bolted down q Place properly sized pre...

Page 3: ...ge Pressure Sensing Lines 4 5 Flex Hose 5 6 Booster Installation 5 Power Supply 5 Plumbing 5 Piping 5 7 Discharge Receiver and Discharge Check Valve 6 Service Distance 6 General Information 7 Notice t...

Page 4: ...per scfm Manual ball valves should be placed on either side of suction receiver to enable service isolation Tank should be placed within 10 of the booster See Receivers section 4 Suction Discharge Pre...

Page 5: ...the booster Pipe systems must have rigid supports per local codes Power Supply Required A connection of proper voltage is required Voltage is listed on the inside of the door to the Odyssey control p...

Page 6: ...or local regulation requirement whichever is furthest Recommended Booster should be placed with at least 18 distance between other components for serviceability and air circulation 7 Discharge Receive...

Page 7: ...ntilated and well lit area that accommodates inspection and maintenance access Provide an unobstructed machine boundary of at least 18 with adequate air flow and service space around the booster The a...

Page 8: ...s filter Damage to the machine will occur if contamination is drawn into the booster and will void the warranty Do NOT use pipe dope or excessive thread tape as these may damage the booster Boosters a...

Page 9: ...sation tank sometimes called a buffer or suction receiver tank and a discharge receiver tank Discharge receiver tanks must be separated from the booster with a check valve Receivers should be sized as...

Page 10: ......

Reviews: