Page 1: ...Odyssey Easy Installation Guide...
Page 2: ...ose q Nitrogen Boosters must have an suction receiver sized per Receivers section of this manual Ensure that suction and discharge receiver tanks are secured and bolted down q Place properly sized pre...
Page 3: ...ge Pressure Sensing Lines 4 5 Flex Hose 5 6 Booster Installation 5 Power Supply 5 Plumbing 5 Piping 5 7 Discharge Receiver and Discharge Check Valve 6 Service Distance 6 General Information 7 Notice t...
Page 4: ...per scfm Manual ball valves should be placed on either side of suction receiver to enable service isolation Tank should be placed within 10 of the booster See Receivers section 4 Suction Discharge Pre...
Page 5: ...the booster Pipe systems must have rigid supports per local codes Power Supply Required A connection of proper voltage is required Voltage is listed on the inside of the door to the Odyssey control p...
Page 6: ...or local regulation requirement whichever is furthest Recommended Booster should be placed with at least 18 distance between other components for serviceability and air circulation 7 Discharge Receive...
Page 7: ...ntilated and well lit area that accommodates inspection and maintenance access Provide an unobstructed machine boundary of at least 18 with adequate air flow and service space around the booster The a...
Page 8: ...s filter Damage to the machine will occur if contamination is drawn into the booster and will void the warranty Do NOT use pipe dope or excessive thread tape as these may damage the booster Boosters a...
Page 9: ...sation tank sometimes called a buffer or suction receiver tank and a discharge receiver tank Discharge receiver tanks must be separated from the booster with a check valve Receivers should be sized as...