15
Power Tower - User manual - English
Step 3: Wire the L14-30P based on the following:
120V Model:
• Connect L1 to X
• Connect N to W
• Connect Ground to G
Always ensure the voltage measured between X and W is 120V.
120V/240V Model:
• Connect L1 to X
• Connect L2 to Y
• Connect N to W
• Connect Ground to G
Always ensure the voltage measured between X and Y is 240V.
Step 4: Turn on generator or grid power.
BOTH PLUGS MUST BE FED BY SAME SOURCE AND PHASE
Each plug has a 30A breaker to ensure no more than 30A is drawn per plug. Ensure that the phases
are matching.
Single 120V 30A Input:
When charging the Power Tower system using only a single 120V 30A input, ensure that the
charging rate and power drawn from the load (home) is less than 30A.
3.5 Automatic Generator Start (AGS)
The two-wire connection that is provided with the Power Tower allows for automation of a backup
generator when solar power is insufficient. The two-wire system closes a relay when a low voltage
scenario is detected and opens when the batteries have reached a higher voltage.
AGS relay ON: 51Vdc
AGS relay OFF: 54.6Vdc
Summary of Contents for POWER TOWER 120V
Page 2: ...2 Batt Pack Energy User manual English...
Page 4: ...4 Power Tower User manual English MANUAL INDEX...
Page 6: ...6 Power Tower User manual English OVERVIEW SECTION 1...
Page 8: ...SAFETY INFORMATION SECTION 2...
Page 11: ...INSTALLATION SECTION 3...
Page 16: ...GROUNDING SOLAR WIRING SECTION 4...
Page 19: ...SYSTEM CONFIGURATION SECTION 5...
Page 28: ...SPECIFICATIONS SECTION 6...
Page 33: ...WARRANTY SECTION 7...
Page 36: ...DISPOSAL SECTION 8...
Page 38: ...APPENDIX SECTION 9...
Page 41: ...41 Power Tower User manual English INVERTER Figure 8...
Page 42: ...POWER TOWER...
Page 43: ......
Page 44: ...POWER TOWER...