Installation and Maintenance Manual
15
Detailed Installation Instructions for HRG Swing Gate Operator
1) Mount control box and connect all conduit fittings.
a) Mount controller box within 100’ of the gate operator, preferably within 20’. If installing the DC
version of the operator, mount the battery power supply very near the controller enclosure
because of the high current demand by the DC motor – See the Two Part operator section.
b) Attach all electrical conduits as required, note the diagram below and see step number 3.
2) Mount operator post
a) Using 5/8" – 3/4” anchor bolts, mount the 12”
square operator base with 1” clearance between
the base and the backing post or wall. The gap
between the operator post and the backing post
will be 3 1/2”. It is important that the finished
installation be plumb and true. Use shims if
necessary to level the operator base.
b)
Attach the top of the operator to the backing post
or supporting wall, using the bracket provided.
The attaching bracket "sleeves" inside the top of
the operator post.
Note! The backing
post/column, (provided by others) must
accommodate all of the "tip over" loads
imposed by the gate panel.
Summary of Contents for HRG 220 ST
Page 15: ...Installation and Maintenance Manual 9 Swing Gate Post Details ...
Page 16: ...Installation and Maintenance Manual 10 HRG 220 Pump Pack ...
Page 17: ...Installation and Maintenance Manual 11 HRG 222 Pump Pack ...
Page 18: ...Installation and Maintenance Manual 12 How Our Hydraulic Swing Gates Work ...
Page 25: ...Installation and Maintenance Manual 19 Instructions for Hand Pump or Manual Operation ...
Page 29: ...Installation and Maintenance Manual 23 ...
Page 47: ...Installation and Maintenance Manual 41 ...
Page 48: ...Installation and Maintenance Manual 42 ...
Page 62: ...Installation and Maintenance Manual 56 Battery Connection Diagram ...
Page 63: ...Installation and Maintenance Manual 57 Battery Connection Diagram ...
Page 65: ...Installation and Maintenance Manual 59 Wire Size Schedules ...
Page 66: ...Installation and Maintenance Manual 60 Parts Breakout HRG 220 Pump Packs ...
Page 67: ...Installation and Maintenance Manual 61 Parts Breakout HRG 222 Pump Packs ...
Page 68: ...Installation and Maintenance Manual 62 Parts Breakout Control Box ...
Page 69: ...Installation and Maintenance Manual 63 Parts Breakout Post ...
Page 70: ...Installation and Maintenance Manual 64 Parts Breakout DC Power Supply ...