SECTION 6
OPERATION
Before use each day or at the beginning of each shift, the machine shall be given a visual inspection and
functional test. Repairs (if any) must be made prior to operating the machine, as it is critical to ensure safe
operation of the machine. A checklist for pre-start inspection can be found in the back of this manual.
6.1 | BEFORE YOU OPERATE
FIGURE 14: Base Controls
Item Control | Indicator
1
Emergency Stop Button
(Operation described in section 2.5)
2
Power Indicator Light
(Illuminates when power is on)
3
Alarm
(Operation described in section 6.7)
Alarm sounds for descent, descent delay, or warning that machine is on a slope.
4
Key Switch
(Operation described in section 6.4)
5
Elevate/Lower Switch
(Operation described in section 6.5)
6
Diagnostic Connection Port
7
Overload Indicator Light
(Operation described in section 6.6)
8
Enable Button
(Operation described in section 6.5)
9
Battery Charger Port
(Operation described in section 6.8)
10
Charger Light Window
(Operation described in section 6.8)
6.2 | LOWER CONTROLS
PUSH-AROUND SERIES
PA-1030
24
Summary of Contents for PA-1030
Page 21: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK 21 OPERATION SAFETY MANUAL PA1 1 S REV A ...
Page 29: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK 29 OPERATION SAFETY MANUAL PA1 1 S REV A ...
Page 34: ...NOTES PUSH AROUND SERIES PA 1030 34 ...
Page 35: ...NOTES 35 OPERATION SAFETY MANUAL PA1 1 S REV A ...