
7
4.Arc voltage inspection signal: work piece side arc voltage inspection signal input
(
)
terminal
,
connect with arc
voltage inspection cable from work piece side
(2)
(1)
(3)
(4)
4.3
Back panel instruction
(
1
)
Power switch: over current protection switch, when machine abnormal, this switch will power off to protect the
machine. Please separately connect power switch when install the machine
(
2
)
Communication plug X1: power source parallel control connecter or synchronize control communication plug, input
plug
(
)
. Pin 1 is for whole communication signal A, pin 2 is for whole communication signal B, other 5 pin is for
reservation.
(
3
)
Communication plug X2: power source parallel control connecter or synchronize control communication plug, input
plug
(
)
. Pin 1 is for whole communication signal A, pin 2 is for whole communication signal B, other 5 pin is for
reservation.
(
4
)
Fuse FU1
(
5A
)
: used for control transformer over current protection(control circuit, fan, remote control output)
(
)
.Make sure the power source is no electricity when turn on the fuse.
(
5
)
Power cable connector: three phase power input
(
)
;
(
6
)
Ground connect
(
)
screw
(
M8
)
: must be stable and fit the state standard
(
7
)
Cable fix block: to fix the three phase input cable