Excelon EZ Operator’s Manual
37
5.4.3 Starting a New Job & Loading a Job
Starting a New Job
When the edger receives data from the tracer, new job is started. Job number
assigned in reqular sequence and displayed on top of the LCD screen(#001). Frame
data displayed on the center of the screen in actual measurement. Layout and
edging option applied from the user-defined configuration value in Menu mode.
Loading a Job
In the middle of designing lens if the edger receives new data from the tracer, new
data saved in the internal memory temporalily. And * icon displayed on the LCD
screen(#004 *). Now new data is in the waiting state.
Press the [LOAD] button to load new data from the memory.
Example)
Current job is #004.
New data received and saved in the
internal memory.