1-8
I
nstallatIon
P/N 0515388_L
U.S. & Canada 1-800-922-1919 • Mexico 01-800-890-2900 • www.hussmann.com
JOINING INSTRUCTIONS
Sectional construction means that two or more
merchandisers may be joined in line yielding
one long continuous display requiring one pair
of ends.
a
ll
joinTs
musT
be
air
-
TighT
To
prevenT
formaTion
of
ice
or
condensaTion
.
Prep Merchandiser
1. Check to be sure that merchandisers are
level and that the factory-installed nut retainers
are in place. Locate the Joining Kit and check
contents.
2. Remove shelves (if installed), display
racks, pans and front air grilles from the right
end.
3. Remove the rear interior panel(s) from
the right end. On multi-deck merchandisers
remove the lower back panel first. To remove
a panel, lift it up from its bottom edge and
out. No tools required.
Apply Gaskets as Follows:
Right End
1. Apply the 1 inch (25 mm) gasket around
the perimeter of the merchandiser as shown.
It must be at the edge. Check to be sure that
there are no gaps between gasket and
merchandiser.
2. Apply the 1
5
/
8
in. (41 mm) gasket so that
one edge is on the metal merchandiser frame
and the parallel edge laps the 1-inch gas-
ket. Check to be sure that there are no gaps
between merchandiser and gaskets.
R
efeR
to
G
asket
diaGRam
and
detail
views
on
next
paGe
.
A continuous bead of silicone sealant/ caulk
may be used in addition to gaskets on mating
surfaces but must not be used in lieu of gaskets.
IMPORTANT
• Do not stretch gasket,
especially around corners.
• Do not butt gaskets;
always overlap them as shown.
• Remove paper backing
after gasket has been applied.
• Maintain a 3 in. space between mer-
chandiser and wall to
prevent condensation.
•
Perimeter gasket required by
NSF.
• End caps required for rail light.