IMPACT Rear Roll-in
INSTALLING D5RRI
The D5RRI must be securely anchored to the
floor and cooler wall after it has been leveled in
its permanent position. Prelocated anchoring
holes are provided in the front assembly,
uprights, side braces, and top “L” bracket.
Sealing
For proper performance, safety and sanitation,
apply a generous bead of sealant betwwen the
D5RRI and the floor, between the D5RRI top
and sides and the cooler wall, around the interi-
or perimeter of the base at the floor, and along
the exterior front of the base at the floor.
REAR CURTAIN INSTALLATION
Rear curtains are provided with each case, two
per 8 ft model, 3 per 12 ft model. Curtains should
be installed just before start-up to prevent dam-
age.
1. Slide all hangers onto track at rear of the
case. Use ALL hangers so the curtains will drape
properly.
2. Snap a stop clip onto each end of the track.
3. Hang curtains on hangers.
JOINING
Sectional construction means that two or more
merchandisers may be joined in line yielding one
long continuous display requiring only one pair
of ends.
Joint kits and instructions are shipped
with each case.
To join like fixtures, a joint assembly is
required. To join unlike fixtures, or like fixtures
operating at different temperatures, a 1
1
/
2
inch
(38 mm) partition kit is required.
A
LL JOINTS MUST BE AIR
-
TIGHT TO PREVENT
FORMATION OF ICE OR CONDENSATION
.
Refer to separate joining instruction shipped
with each case
INSTALLING PARTITIONS
To join unlike fixtures, or like fixtures operating
at different temperatures, a 1
1
/
2
in. (38 mm) par-
tition kit is required.
Instructions for installing these partitions are
included with the kits.
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
P/N 0435045A
1-5
Hanger
Stop
Curtain
Do NOT remove shipping braces until
the merchandisers are positioned
for installation. Once unfastened,
NEVER LEAVE THE MERCHANDISER
UNSUPPORTED OR UNATTENDED
until it has been anchored.
WARNING
!