background image

 


Install gasket on retainer and insert in opening. 
 
Putting downward pressure on gasket-retainer.  Reinstall phillips head screws 
 
Stretch gasket downward and install gasket bottom flange over retainer flange. 
 
HOW TO REPLACE HEATERS –  
 
Disconnect power to cabinet, remove collar as shown. 
 
Lift off collar and retainer, being careful not to put stress on the heater connections. 
 
Remove old heater from slot and carefully remove leads from cavity and disconnect. 
 
Remove old heater from slot with leads aligned with connector cavity. 
 
Connect heater leads and push excess leads into cavity.  Avoid bending of heater and 

connections other than required for installation.  Replace retainer and collar on 
cabinet. 

 
Install screws through retainer into cabinet. 
 
Pull rubber collar down over bottom edge of collar retainer, being certain retainer is in 

collar groove. 

 
Re-connect cabinet power. 
 
SEE THE DIAGRAMS ON THE FOLLOWING PAGE FOR MORE REFERENCE 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Summary of Contents for 10HD

Page 1: ...F 8 Ice Cream Dipping and Storage Chest P N OII HD HS 8HDF January 2006 First Call for help US and Canada 1 800 922 1919 Soporte T cnico y Asistencia M xico 01 800 522 1900 For a Service Network Locat...

Page 2: ...sulation and 3 Main Top Condensing Unit Cabinet Dimensions Electrical and Capacity 4 Installation and Start Up 5 Temperature Control and Defrosting 5 Cleaning Condenser 6 Cleaning Exterior 6 Cleaning...

Page 3: ...sembly and then welded to the cabinet base assembly to give complete strength and du rability This assembly is processed through a chemical treatment and painted with an enamel powder paint for a las...

Page 4: ...8 25 5 8 8 HDF 54 1 16 30 1 2 32 1 2 49 15 16 26 3 8 25 5 8 Add 8 to top for syrup rail ELECTRICAL CAPACITY Volts Run Breaker Ship Cubic 2 1 2 3 of Amps Size Wt Feet gal gal Lids 115 3 4 15 amp 188 4...

Page 5: ...VOLTAGE AS MEASURED AT THE COMPRESSOR TERMINAL DUR ING OPERATION MUST NOT VARY MORE THAN 5 FROM CABINET SE RIAL PLATE RATING NOTE DO NOT DRILL ANY HOLES IN SIDE OF CABINET WITHOUT FIRST GETTING INSTR...

Page 6: ...of the cabinet use a soft cloth or sponge with wa ter and a mild detergent Rinse and wipe dry CLEANING INTERIOR For cleaning the interior of the liner storage area a flush out drain has been provided...

Page 7: ...l plate for proper electrical requirements 2 Defective compressor 2 Replace 3 Defective relay 3 Replace 4 Restriction pinched cap tube 4 Repair or replace 5 Restriction moisture 5 Leak check replace d...

Page 8: ...control feeler tube into well 3 Short on refrigerant 3 Leak check change drier and recharge Compressor runs continuously product too warm 1 Short on refrigerant 1 Leak check change dryers evacuate and...

Page 9: ...ions Remove old heater from slot and carefully remove leads from cavity and disconnect Remove old heater from slot with leads aligned with connector cavity Connect heater leads and push excess leads i...

Page 10: ......

Page 11: ...XXXXXXXXXX XXXX XXXX E C N TOLERANCES UNLESS OTHERWISE SPECIFIED FRACTIONAL DECIMAL HOLE LOCATION SPACING M S MOTOR COMPRESSOR OVERLOAD HIGH WIRES PRESSURE CONNECTOR CONTROL HEATER BLK 1 GRN ORN START...

Page 12: ...IZE RED DIE NO XXXX TAP CONNECTORS XXX BY XX XX XX DATE REV E C N HOLE LOCATION SPACING 1 64 HD 6 R 404A M S HEATER WIRES CONNECTOR ORN RED GRN ANTI SWEAT HEATERS BLK ORN WHT RELAY START 0 031 1 CAP T...

Page 13: ...AWN BY DATE DRAWN APPROVED BY JWL 12 19 95 INCHES 1 OF 1 TOLERANCES UNLESS OTHERWISE SPECIFIED FRACTIONAL 1 32 DECIMAL 0 031 ANGULAR 1 HOLE LOCATION SPACING 1 64 COMPRESSOR HS 2 HD 4 R 404A M S RELAY...

Page 14: ...19 95 INCHES 1 OF 1 TOLERANCES UNLESS OTHERWISE SPECIFIED FRACTIONAL 1 32 DECIMAL 0 031 ANGULAR 1 HOLE LOCATION SPACING 1 64 S R C 1 S N 2 START CAP COND FAN GRND COMPRESSOR MOTOR OVERLOAD RELAY TEMP...

Reviews: