2. Adjust the blade pitch until there is tension in the
blade pitch cable. Refer to
on page 36
.
3. Move the product across the concrete surface. (Fig.
45)
a) Adjust the throttle control to an applicable speed
for the condition of the surface. Too high speed
can cause damage to the surface.
b) Adjust the blade pitch to increase the pressure
on the concrete surface as necessary during
operation.
c) Move from one side to the opposite side across
all of the concrete surface (A). When you turn to
go in the opposite direction, do an overlap of ½
the diameter of the blade assembly.
d) Move from one side to the opposite side across
all of the concrete surface in a perpendicular
pattern (B). When you turn to go in the opposite
direction, do an overlap of ½ the diameter of the
blade assembly.
4. Stop the product and remove it from the concrete
surface.
5. Wait until the concrete is sufficiently set.
6. Do the procedure again and again until the concrete
surface has a satisfactory finish and is fully set.
Note:
The period of time between troweling
operations is calculated from how quickly the concrete
sets.
To move the product in different
directions
• To turn to the left, lift the handle. (Fig. 46)
• To turn to the right, push the handle down. (Fig. 47)
• To move the product forward, push the handle
forward. (Fig. 48)
• To move the product rearward, pull the handle
rearward. (Fig. 49)
To stop the product
1. Move the throttle control to the idle speed position.
2. Push the stop button for the engine. Refer to
.
3. Set the engine ON/OFF switch to the OFF position.
4. Move the fuel valve to the OFF position.
Maintenance
Introduction
WARNING:
Read and understand the
safety chapter before you do maintenance
on the product.
WARNING:
Before you do
maintenance, stop the product and make
sure that all parts of the product become
37
.
Put the product on a flat surface.
For all servicing and repair work on the product, special
training is necessary. We guarantee that professional
repairs and servicing is available. If your dealer is not a
service agent, speak to them for information about the
nearest service agent.
For spare parts, speak to your Husqvarna dealer or
service agent.
Maintenance schedule
* = General maintenance done by the operator. The
instructions are not given in this operator's manual.
X = The instructions are given in this operator's manual.
O = Refer to the engine manual for instructions.
Maintenance
Before use,
each 10 h
After the
first 20 h
Monthly,
each 200 h
Yearly, each
500 h
Make sure that there are no fuel or oil leaks.
*
Clean the product.
X
Make sure that nuts and screws are tightened.
*
Do a check of the fuel level and the engine oil level.
X
Clean the cooling fins of the engine.
O
O
Make sure that the throttle control and the blade pitch
knob or Pro-Shift
®
lever can move smoothly.
*
1452 - 002 - 20.05.2022
37
Summary of Contents for CT 36
Page 2: ...17 15 16 23 22 21 20 19 18 24 1 2 3 4 5 10 14 9 6 11 12 8 7 13 1 2 H H L L W 3 ...
Page 4: ...A 24 A B 25 C D 26 E E 27 C D 28 F G 29 30 31 ...
Page 5: ...32 A B 33 A B 34 C 35 36 37 38 39 ...
Page 6: ...40 41 42 A 43 B 44 A B 45 46 47 ...
Page 7: ...48 49 50 A 51 52 53 54 55 ...
Page 8: ...A 56 A 57 B A 58 59 60 A 61 62 ...
Page 334: ... 本製品が不要になった場合は Husqvarna 販売店に 送付するか リサイクル施設で廃棄してください 334 1452 002 20 05 2022 ...