![Husqvarna 2014 TE 125 EU Owner'S Manual Download Page 51](http://html.mh-extra.com/html/husqvarna/2014-te-125-eu/2014-te-125-eu_owners-manual_172603051.webp)
12 SERVICE WORK ON THE CHASSIS
49
» If detent positions are noticeable:
–
Adjust the play of the steering head bearing.
x
–
Check the steering head bearing and change if necessary.
Finishing work
–
Remove the motorcycle from the lift stand. (
12.14
Adjusting the play of the steering head bearing
x
Preparatory work
–
Raise the motorcycle with the lift stand. (
L01629-10
Main work
–
Loosen screws
1
. Remove screw
2
.
–
Loosen and retighten screw
3
.
Guideline
Screw, top steering head
M20x1.5
12 Nm (8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
1
.
Guideline
Screw, top triple clamp
M8
17 Nm (12.5 lbf ft)
–
Mount and tighten screw
2
.
Guideline
Screw, top steering stem
M8
17 Nm
(12.5 lbf ft)
Loctite
®
243™
Finishing work
–
Check the play of the steering head bearing. (
–
Remove the motorcycle from the lift stand. (
12.15
Greasing the steering head bearing
x
800010-10
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
12.16
Removing the front fender
Preparatory work
–
Switch off all power consumers and switch off the engine.
–
Remove the headlight mask with the headlight. (
C00596-10
Main work
–
Disconnect plug-in connectors
1
of the turn signals.
–
Remove screws
2
.
–
Take the brake line and wiring harness out of the brake line guide.
Summary of Contents for 2014 TE 125 EU
Page 2: ......