background image

3

2

SETTING POSTS

STEP 1

Dig holes 8”- 10” in diameter and anywhere from 24”, 30” or 36”

deep depending on your local weather and soil conditions.

STEP 2

Position the post in the hole.  The post should be centered in the 

hole and must be square with the fence line so that when the rails are 

inserted into place they will parallel the string line.  Check the post

on two adjacent sides with a carpenter’s level and adjust as necessary 

to make sure it is plumb.  The fence height above grade is also 

determined at this time.

STEP 3

Pour concrete around the posts and fill up to ground level.  Wet or 

dry concrete works fine.  If using dry concrete water down around the 

posts when you are ready for the concrete to start setting up.  The

concrete will be set up in about 24 hours.  Repeat this step until all 

post are set and ready for rail insertion and gate install if needed.

     HUSKER VINYL 

R

anch

 R

ail

 F

ence

 & G

ate

Installation  Instructions  

2 RAIL 

3 RAIL 

t

t

t

t

24”

8”- 10” dia.

t

t

t

t

30”

8”- 10” dia.

4 RAIL 

t

t

t

t

36”

8”- 10” dia.

Reviews: