PAGE 4
Your PurgEye
®
300 Plus Weld Purge Monitor
®
is an instrument
to read from 0.1% (1000 ppm) down to 0.0001% (1 ppm) oxygen.
Your PurgEye
®
300 Plus Weld Purge Monitor
®
delivery and
storage box contains:
By following the instructions about how to use your PurgEye
®
300
Plus, you will become quickly familiar with its operation and there
should be no trial and error involved.
1.
Familiarise yourself with this manual and the PurgEye
®
300
Plus controls.
2.
Switch on the PurgEye
®
300 Plus. See item 3 below. Continue
to learn the controls.
3.
Connect the green tubing to the white connector at the rear
of the instrument. The other end of the green tubing, with the
filter unit, should be attached to the exit hose of the product
that you are purging, so that the exiting gas can pass through
the filter and then into the monitor housing and internal sensor
to be measured.
WarNINg: The monitor should not be connected directly to a high
pressure, unregulated cylinder.
gETTINg STarTED
•
The PurgEye
®
300 Plus Weld Purge Monitor
®
.
•
150 mm long red tube to attach to red purge exhaust.
•
1 metre long green tube with filter.
•
Mains lead with psu (power supply adaptor) and plug package
to suit 110-250V, 50/60hz AC supply for all countries.
•
This User Instruction Manual.
•
PurgeNet™ head for connecting to PC for PurgeLog™ or
accessories.