4
Dig a hole a minimum depth of
300mm or until you reach hard
clay with a spade and give it
some undercut before
concreting the base pegs in.
The pegs must be concreted
into hard ground, not loose fill.
The base is powder coated green. This protects the base from ground salts and makes it far more
durable when in ground contact.
X
Y
Titan 79
6’11”
9’5”
X
Y
Titan 79
2097mm
2859mm
Base