Chapter 3 • Installing the antenna and radio assembly
28
1037749-0001 Revision B
4. Fit the two sections of the feed horn collar around the ridge at
the point where the feed horn meets the polarizer, as shown in
Figure 22.
5. Rotate the collar until it seats into the notch on the feed horn.
You must locate the notch before fully assembling the collar.
Failure to do so will result in damage to the polarizer
waveguide. When properly aligned, the two halves of the
collar will line up with the seam on the polarizer waveguide
as shown in Figure 23.
Figure 21: Aligning the feed horn on the adapter bracket
Figure 22: Radio assembly and feed horn installed
Summary of Contents for AN8-074P
Page 14: ... Tables xiv 1037749 0001 Revision B ...
Page 20: ...Chapter 1 Overview 6 1037749 0001 Revision B ...
Page 46: ...Chapter 3 Installing the antenna and radio assembly 32 1037749 0001 Revision B ...
Page 58: ...Chapter 5 Adjusting the antenna azimuth and elevation 44 1037749 0001 Revision B ...
Page 60: ... Acronyms and abbreviations 46 1037749 0001 Revision B ...