A Summit vertical lift partition consists of a series of individual panels with guide
rollers at each end that ride in guide rails located at both ends of the opening.
The partition is electrically operated. The panels travel vertically through a
narrow slot in the ceiling where they are stored when not in use.
CAUTION:
Your electric partition is a moving piece of machinery and requires appropriate caution while it is
being extended or retracted. NEVER ALLOW THE PARTITION TO BE ACTIVATED WITHOUT
PROPER SUPERVISION.
General Information:
1.
Only personnel who have been trained in accordance with these operating instructions should be permitted to
operate the partition.
2.
To operate the partition, a key is required to
activate the main switch (Fig. 1)
Options:
a. If a second switch has been ordered, it
may be placed at the opposite end from
the main switch. It will have a push
button (see Fig. 2). The rocker switch on
the main switch and the push button are
to be pressed simultaneously for the
partition to extend or retract in the
opening.
b. A Master Key Switch is an option (see
Fig. 3). It will operate the same as the
main switch but the switch plate will be
wider.
3.
Caution people in the vicinity to maintain a safe distance while the
partition is in operation.
4.
Report any malfunction to your local Hufcor Distributor at once.
HUFCOR OWNERS MANUAL FOR SUMMIT VERTICAL LIFT PARTITION Page 2 of 4
Fig. 2 Optional Push Button
IMPORTANT: Be certain to read through these operating instructions before operating
your panels. An overall understanding of how to operate the partition will prevent
accidental damage to the partition, and, more importantly, to people in the area. Make
certain everyone who moves the panels has been trained in their proper operation.
Your Hufcor Representative will be happy to provide training assistance if needed.
F o r m o r e i n f o r m a t i o n a b o u t H u f c o r p a r t i t i o n s , v i s i t w w w . h u f c o r . c o m
Fig. 3 Master Key Switch
Fig. 1 Key Switch