
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany
• www.huck.net
\\CAD1\Standard\4652\Montageanleitung\Vogelnestbaum_Leimbinder_4652_SO_B_L_1_GBR.doc
- 37 -
11 Monthly maintenance
•
Check the spaces between the equipment and the ground (clearance and
height of fall).
•
Check the ground surface in the area with fall protection for hard objects
and loose foundations.
•
Check all connecting elements and fittings for wear and tear and tighten if
necessary. Replace damaged or missing parts.
•
Check that moving metal parts (joints, springs, etc.) move smoothly and
are not worn. Replace if necessary. It is not necessary to lubricate joints as
we only use maintenance-free metal roller bearings.
•
Check all attachments such as chains, ropes, nets, etc. for damage and
replace if necessary.
•
Check rubber parts, sleeves, etc. for wear and tear or damage and replace
if necessary.
•
If necessary, remove excess padding material from the post footings due to
danger of rotting.
•
Check the surface of wooden parts for damage caused by the weather or
external influences and mould. Repair or replace if necessary.
•
Check the surface of plastic and metal parts, e.g. slides, for damage and
replace if necessary.
12 Quarterly maintenance
•
Detailed inspection of the operation and stability of the equipment paying
particular attention to any wear and tear.
•
Tighten all forms of attachment.
•
Repaint and retreat surfaces.
•
Maintenance of fall protection surfaces.
•
Lubrication of joints.
•
Check the height of the fall and top up with loose filler if necessary. If the
posts are labelled, top up as far as the mark.
•
Retighten all bolts