Page 1: ...2 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 1 A Assembly Instructions Bird s nest tree with bridge and slide Art No 4652 2 Operator _____________...
Page 2: ...2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 2 Revision history Revision 0 2015 03 04 The first allowed version JS Assembly Instructions FH Revision...
Page 3: ...2 Datasheet Bird s nest tree with bridge and slide Art Nr 4652 2 5 3 Delivery contents parts list with part numbers 7 4 Assembly instructions 15 5 Post installation checks 33 B Maintenance instructio...
Page 4: ...k Seiltechnik GmbH Adress Huck Seiltechnik GmbH Dillerberg 3 D 35614 A lar Berghausen Tel 49 6443 83 11 0 Fax 49 6443 83 11 79 Please do not hesitate to call your supplier if you have any problems dur...
Page 5: ...2 grain size 300 400 2000 3000 Gravel 2 8 grain size 300 400 2000 3000 Other ground materials As recommended by manufacturer Critical fall height as checked Name and overall dimension of the largest...
Page 6: ...undations approx 7 hours Required assistance 3 persons Required tools wheel excavator or similar with a lifting height of approx 4 m height ladder approx 4 m long spirit level various wrenches and scr...
Page 7: ...219 1 mm 1240 mm 04 8 Glue laminated beam 139 mm 1650 mm lg 05 4 Top rope for glulam pole pre assembled on Pos 03 1850 mm lg 06 1 Flag blue threaded bolt 2x nuts M16 07 1 Traverse 1500 mm lg 50x50x5 m...
Page 8: ...2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 8 114 4 Caps black Washers Stop nuts M12 115 2 Allen screws and Washers M8 x 75 mm 200 KNR 1 PVC pipe P...
Page 9: ...tandard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 9 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quanti ty Symbol 01 1 193 7 mm...
Page 10: ...k net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 10 04 8 140 mm 1650 mm lg 05 4 1850 mm lg Pre assembled on Pos 3...
Page 11: ...www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 11 102 18 365 mm lg 103 16 M12 104 8 M12 1x pre assembled 105 8 139 mm...
Page 12: ...et www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 12 111 2 M12 x 80 mm 112 1 500 x 500 mm 113 48 M12 114 4 M12 115 2 M...
Page 13: ...glue laminated beams the ropes must first be hooked in O K Top edge play level O K F Top edge foundation OAZ The opening must be show outwards not in tensile direction PNU Lay the net part packet with...
Page 14: ...uecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 14 The natural properties of wood can lead to different cross sections in heat and humidity e g Post 180 mm tolerance 173mm 183mm Possible length...
Page 15: ...bH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 15 5 Ass...
Page 16: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 17: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 18: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 19: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 20: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 21: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 22: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 23: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 24: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 25: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 26: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 27: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 28: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 29: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 30: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 31: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 32: ...iltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR...
Page 33: ...been installed safely in the following cases Safe equipment installation is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational sa...
Page 34: ......
Page 35: ...ar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 35 B Maintenance instructions Bird s...
Page 36: ...2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 36 Revision history Revision 0 2015 03 04 The first allowed version Maintenance instruction FH Revision...
Page 37: ...repairs are carried out a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained directly from your su...
Page 38: ...charac teristics of stainless steel is that uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another sim...
Page 39: ...crews should always be tightened and checks carried out to ensure that there are no missing screws e g look out for holes you can see through 8 11 Preventing equipment use Use of the equipment should...
Page 40: ...function of the equipment 9 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to inten...
Page 41: ...mbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4652 2 Montageanleitung 4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR doc 41 10 R...
Page 42: ...arings 11 5 Check all attachments such as chains ropes nets etc for damage and replace if necessary 11 6 Check rubber parts sleeves etc for wear and tear or damage and re place if necessary 11 7 If ne...
Page 43: ...nts that have been added or replaced Annual Maintenance 14 Annual maintenance 14 1 Ascertaining that the equipment foundations and surfaces are safe for operation 14 2 In particular the equipment shou...
Page 44: ......
Page 45: ..._______________________ Location _______________________________________________________________________________________ Customer or operator __________________________________________________________...
Page 46: ......
Page 47: ...rten etc ____________________________________________________________________ ____________________________________________________________________ Competent person in charge __________________________...