![Huck 4652-2 Assembly Instructions Manual Download Page 43](http://html1.mh-extra.com/html/huck/4652-2/4652-2_assembly-instructions-manual_2181036043.webp)
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen
\\CAD1\Standard\4652-
2\Montageanleitung\4652_2_Vogelnestbaum_Bruecke_und_GFK_Rutsche_mit_Leimbinder_SO_B_L_01_GBR.doc
43
13
Half yearly maintenance
13.1 Stability (check posts, bracing, foundations, etc.). Ascertaining whether
there are any changes in equipment safety as a result of repairs that
have been carried out or components that have been added or replaced.
Annual Maintenance
14
Annual maintenance
14.1 Ascertaining that the equipment, foundations and surfaces are safe for
operation.
14.2 In particular, the equipment should be checked for decay and corrosion.
It may be necessary to dig out or excavate certain components in order
to do so. Zinc paint should be applied to corroded areas and scratches.
The equipment must be inspected by someone
with the necessary
expertise
in strict compliance with the instructions issued by Huck
Seiltechnik GmbH.
A copy of the inspection record should be given to the operator,
who must confirm receipt.