![HUCK Seiltechnik Midi Climbing Teepee Installation Instructions Manual Download Page 25](http://html1.mh-extra.com/html/huck-seiltechnik/midi-climbing-teepee/midi-climbing-teepee_installation-instructions-manual_2181095025.webp)
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
[email protected] - www.huck.net
Voglnestbaum Mini 4652-30
- 25 -
12 Half Yearly Maintenance
•
12.1
The stablity of supporting posts, supports, foundations etc. Has to be
checked. The safety level of the entire system has to be checked after repairs
have been carried out or additional system components have been installed or
replaced.
13 Annual Maintenance
•
13.1
Ascertaining that the equipment, foundations and surfaces are safe for
operation.
•
13.2
In particular the equipment should be checked for decay and corrosion. It
may be necessary to dig out or excavate certain components in order to do so.
Zinc paint should be applied to corroded areas and scratches.
The equipment must be inspected by someone with the necessary
expertise in strict compliance with the instructions issued by Huck
Seiltechnik GmbH.
A copy of the inspection record should be given to the operator,
who must confirm receipt
.