![HUCK Seiltechnik Midi Climbing Teepee Installation Instructions Manual Download Page 24](http://html1.mh-extra.com/html/huck-seiltechnik/midi-climbing-teepee/midi-climbing-teepee_installation-instructions-manual_2181095024.webp)
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
[email protected] - www.huck.net
- 24 -
Voglnestbaum Mini 4652-30 Vogelnestb
10 Monthly Maintenance
•
10.1
Check the spaces between the equipment and the ground (clearance and
height of fall).
•
10.2
Check the ground surface of fall protection for hard objects and loose
foundations.
•
10.3
Check all connecting elements and fittins for wear and tear and tighten if
necessary. Replace damaged or missing parts.
•
10.4
Check that moving metal parts (joints, springs, etc.) move smoothly and
are not worn. Replace if necessary. It is not necessary to lubricate joints as we
only use maintenance free metal roller bearings.
•
10.5
Check all attachments such as chains, ropes, nets etc. For damage and
replace if necessary
•
10.6
Check rubber parts, sleeves, etc. For wear and tear or damage and
replace if necessary.
•
10.7
If necessary remove excess padding material from the post footings due
to danger of rotting.
•
10.8
Check the surface of wooden parts for damage caused by the weather or
external influences and mould. Repair or replace if necessary.
•
10.9
Check the surface of plastic and metal parts for damage and replace if
necessary.
11 Quarterly Maintenance
•
11.1
Detailed inspection of the operation and stablity of the equipment paying
particular attention to any wear and tear.
•
11.2
Tightened all forms of attachment.
•
11.3
Repaint and re-treat surfaces.
•
11.4
Maintenance of fall protection surfaces.
•
11.5
Lubrication of Joints.
•
11.6
Check height of fall protection material and top up with loose filler if
necessary. If posts are labelled, top up to the mark.
•
11.7
Retighten all bolts.