15
DO NOT
proceed until the sensor is installed to aforementioned specifications.
Attach the condensate drain line onto the condensate outlet on the back of the
Geyser-RO
below the
filter. Make sure the drain location is lower than the condensate line so gravity will pull the condensate
from the
Geyser-RO
. If the drain is higher than the condensate line, a condensate pump may need to be
incorporated to properly dispose of condensate from the unit.
Plug the Geyser-RO into a 115VAC receptacle. Turn power back on at the electrical panel. Turn on the
Geyser-RO
and enjoy your energy efficient hot water.
When the installation of the Geyser-RO is complete, the final assembly should look as follows:
Summary of Contents for Geyser-RO
Page 25: ...25 ...
Page 27: ...27 www buytankless com ...