Hubbell DUAL LITE LiteGear LG Series Installation Instructions And User Manual Download Page 7

105.1 AC Wiring Preperations

1.

Remove the system’s front cover.

2.

Make sure the 

LG 

inverter system input and output voltages are correct for the particular appli-

     cation. Remember that the 

LG 

system provides single-phase power only.

3.

The input circuit breaker in the input service panel provides the means for disconnecting AC to the

LG 

inverter system. Only authorized persons shall be able to disconnect AC to the unit. (See 

NEC

700-20 and 700-21).

CAUTION: To prevent electrical shock or equipment damage, for all units, make sure the

LG Battery is disconnected and the AC input circuit breaker at the service panel is OFF

before making AC connections to the LG inverter system.

4.

If not previously done, remove cabinet knockouts for AC Input and AC Output as described in 

Sec-

     tions 104-4, 104.5 or 104.6 

depending on mounting method.

CAUTION:  Do  not  drill  the  cabinet;  drill  filings  may  damage  the  unit  and  prevent  it  from

operating.  If  larger  knockouts  are  needed,  use  a  chassis  punch  to  enlarge  the  appropriate

knockout. Do not add additional or unnecessary knockouts.

5.

Install the input and output conduits.

6.

Run the AC Input service conductors and AC Output conductors through seperate conduits. 

LG

inverter system emergency output circuits shall be installed in dedicated conduit systems and not
shared with other electrical circuits as described in 

NEC 700-9(b)

.

LG 

models can be configured for either 120Vac or 277Vac input connections as well as various modes

 

of output 

opertion as described in this section. Refer to the appropriate wiring diagrams to properly con-nect the utility AC 
power, fixtures and external switching or dimming device (where applicable). Perform

 

all wiring procedures in 

accordance with the applicable codes.  

105.2 AC Input Voltage Selector Plug Installation

LG 

inverter systems may be operated from either 120Vac or 277Vac power sources. Determine the

 

actual AC input line voltage and install the provided Voltage Selector Jumpers in the position next to

 

the 

system terminal block that matches the line voltage potential as shown in the illustration

s

 below.  

NOTE:

Factory terminated 

jumper wires are 

provided with LG 

Systems for making 

user selected input/

output voltage 

connections.

CAUTION: 

Failure to install the Voltage Selector Jumpers will prevent system operation. 

Installing the Voltage Selector Jumpers in the position that does not match the actual AC input 

line voltage will damage the unit, void the warranty and may cause a dangerous or unsafe 

condition.

  

105.3 AC Input/Output Wiring Connections to Terminal Block

Depending on how the fixture load is to be operated, wire the system as described below.

Normally-On Operation

 - 

Connected fixture(s) remain illuminated in AC and emergency modes.

      See 

Wiring Diagram 

A

.

Normally-Off Operation

 - 

Connected fixture(s) illuminate only upon loss of utility AC power.

      See 

Wiring Diagram 

B

.

Normally-On and Normally-Off Operation

 - 

A combination of the operating modes described above.

 See 

Wiring Diagram 

C

.

7.

120V INPUT

277V INPUT

Jumper wires

Jumper wires

Summary of Contents for DUAL LITE LiteGear LG Series

Page 1: ...Manual For LG Series For 375VA 375W 600VA 600W Large Inverter Power Systems Models LG375S Surface Mounted Version LG600S Surface Mounted Version LG375SI LG600SI Surface Mounted Version w Self Test Su...

Page 2: ...rpose Servicing of this equipment should be performed by qualified service personnel SAVE THESE IMPORTANT SAFETY INSTRUCTIONS The installation and use of this product must comply with all national fed...

Page 3: ...am 120Vac and 277Vac connections AC Input output Wiring Connections to Terminal Block Wiring Diagram Switched Dimming Control 120 277Vac Battery Information Tools Battery installation and Connection W...

Page 4: ...Recharge time Meets UL requirements 96 Hours Battery protection Automatic low battery voltage disconnect and reverse polarity protection Standard batteries Sealed Lead Calcium 7 year life Battery vol...

Page 5: ...s hard to detect because it is colorless ororless and lighter than air 103 Installation Requirements 103 1 Operating Environment Install the LG inverter system in a clean cool dry place with normal ve...

Page 6: ...kouts provided using mounting hard ware not supplied sized appropriately to support the unit weight 105 AC Connections CAUTION A LG inverter system units contain hazardous AC and DC voltages Because o...

Page 7: ...277Vac input connections as well as various modes of output opertion as described in this section Refer to the appropriate wiring diagrams to properly con nect the utility AC power fixtures and exter...

Page 8: ...0 volts Load Operation Adjustable Output AO Option Functionally identical to the Switch Load Operation above but provides four 4 independent settings for each of the four dimmable loads See Wiring Dia...

Page 9: ...R DIMMED CIRCUITS SHOWN Note ONLY 2 OF 4 POSSIBLE SWITCHED OR DIMMED CIRCUITS SHOWN See LiteGear loading table on the next page NOTE Dimming switches are designed for independent settings to allow dif...

Page 10: ...gether or to ground earth Be extremely careful to avoid electric shock and burns caused by contacting battery terminals or shorting terminals during battery installation Do not touch uninsulated batte...

Page 11: ...nd upwards Position batteries in the central locations towards rear of the compartments Carefully install battery retention brackets in each compartment with the supplied hardware Reference below imag...

Page 12: ...12...

Page 13: ...will damage the unit void the warranty and may cause a dangerous or unsafe condition 108 System Start Up Procedure IMPORTANT The LG inverter system is a sophisticated electronic backup power supply C...

Page 14: ...d connected loads B Self testing and a 30 second discharge with a randomized start per UL 924 Sec 30 2 once every 30 days after normal utility power has been supplied for a minimum of 48 hours C Self...

Page 15: ...warranty voided if not routinely recharged NOTE To turn power back on follow the System Start up Procedure outlined in Section 108 Be sure to complete all of the steps to ensure the unit will operate...

Page 16: ...by the Manufacturer will void the UL listing of the system and may cause equipment failure To ensure the superior performance of your LG inverter system and to maintain proper charger operation repla...

Reviews: