10
P817-1187 Rev A
5—Installation
Preparation
Step 1. — Modify Existing
Switch Handle
• Refer to Figures 3a and 3b
• Make sure overhead switch is closed
• Loosen and reposition ground strap clamp
so it is out of the way
• Remove the existing manual switch handle,
pole mount bracket and crank.
(see Figure 3a & 3b)
• Establish how high the bottom of the enclo-
sure will be above the ground
• Cut off the control pipe 46 inches (1168
mm) higher than where the enclosure's
bottom will be
External parts can move suddenly and unexpectedly.
This can pose a danger to the general public.
In areas accessible to the general public, this motor operator should
be installed with a minimum vertical height of 8 feet from the ground to
the bottom of the enclosure. If this minimum height cannot be
achieved, use shields, guards, enclosures or fencing to isolate the
motor operator from the general public.
Figure 3b – Switch Handle
After
Modification
Figure 3a – Switch Handle
Before
Modification
!
WARNING