INSTALLATION 

 

This unit is designed to be mounted on a wall or ceiling.  Provide standard units with a single unswitched supply from a 120VAC, 240VAC, 
or 277VAC branch circuit used for normal lighting in the area to be protected.  For Spectron® self-testing/self-diagnostic units, provide unit 
with a 120VAC or 277VAC branch circuit. 
 

The EV unit is equipped with intelligent wiring.  Connect the black wire from the unit to the hot 
building wire (120-277VAC) and the white wire to the neutral building wire. 
(Exception:  The EV2DI-24K, EV2DIB-24K, EV4DI-24K, and EV4DIB-24K models should be 
connected to 220-240VAC supplies only.)

 

 

 
 
 
 
 
 
 
Wall or Ceiling Mount – Back Power Feed 

 

1.  Remove appropriate KO’s in backplate to mount  
     backplate to junction box. 
2.  Remove center KO from backplate and feed supply  
     leads through. 
3.  Secure backplate to junction box. 
4.  To help with wiring, attach cover to backplate with  
     provided plastic hinge. 
5.  Connect wires from the unit to the building leads and  
     secure with wire nuts. 
6.  Connect battery lead to circuit board header as  
     shown. 
7.  For remote models, connect remote lighting load to  
     black(-) and red(+) pigtails from circuit board.  When    
     connecting leads for remote lighting loads, observe  
     proper polarity to ensure proper operation. 
8.  Installer should now become familiar with the eyeball  
     aimability and its limitations.   
 

 

 
 
 

 
 
 
 
 
 
 
Wall Mount – Surface Wiring (Top Power Feed Only) 

 

1.  Remove appropriate KO’s in backplate and  
     mount backplate to wall. 
2.  Feed wires through and secure conduit to  
     backplate.  
3.  Remove the breakout on top of the housing. 
4.  To help with wiring, attach cover to backplate  
     with provided plastic hinge. 
5.  Connect wires from the unit to the building  
     leads and secure with wire nuts. 
6.  Connect battery lead to circuit board header as  
     shown. 
7.  For remote models, connect remote lighting  
     load to black(-) and red(+) pigtails from circuit board. 
     When connecting leads for remote lighting loads,  
     observe proper polarity to ensure proper  operation. 
8.  Installer should now become familiar with the  
     eyeball aimability and its limitations.   
 

 
 
 
 
 

 

INSTALLATION

INSTALLATION

All EV units are shipped by default with the charger circuit board jumper in the “remote lampheads disabled” position, 

 as shown in Figure 1.  The jumper needs to be moved to the “remote lampheads enabled” position shown in 

Figure 2 if the model being installed is an EV4 (powering a remote unit). 

 
 
 
 
 
 
 
 
 
 
 

 

 

      

Figure 1 

Figure 2  

** 

** 

Looking at the center 
of the circuit board: 

Operation

 
“AC ON” LED is illuminated when AC power is present. 
 
NOTE:  All models are supplied with an AC Lockout circuit, which prevents the emergency lights from illuminating  
             when the battery is connected and no AC power is present. 
 
NOTE:  All models are supplied with a Low Voltage Disconnect circuit, which prevents damage to the battery from  
             deep discharge during prolonged emergency operation. 
 
NOTE:  Batteries are often shipped in a discharged state – this is normal.  The battery will require charging.  Allow  
             24 hours of charging before testing the unit. 

 

Models with SPECTRON

®

 Self-Testing/Self-Diagnostic Circuitry 

 

Models equipped with the Spectron® self-testing/self-diagnostic electronics system provide: 

 Visual indication of AC power status       Visual indication of self-diagnostic test status and results 

-- Visual indication of any unit malfunctions include – 

 Battery Disconnected     Battery Fault     Charger Fault     LED Driver Fault     Lamp Fault   

Spectron equipped units also include: 
Brownout protection:  unit will automatically transfer to emergency operation upon detection of low AC power (approximately 80% of 
nominal line). 
Time Delay Retransfer: upon return of normal AC power, unit will remain in emergency mode for an additional 15 minutes to allow AC 
power to stabilize. 
 

LED Status Indicator 

A bicolor LED (green/red) is provided on the control panel 
of all models equipped with the Spectron® option. 
 

Green Operating Status LED

The green Operating Status LED serves as both an AC 
power and self-test indicator.  During normal operation, 
the green Operating Status LED will be illuminated, 
indicating the presence of AC power.  During all auto- 
matic or manual self-test cycles, the green Operating 
Status LED will blink twice every second. 
 

Red Service Alert LED

Under normal operating conditions, the red Service Alert 
LED indicator will remain off.  If the Spectron® controller 
detects a malfunction, the red Service Alert LED will blink 
in the pattern listed in the following table: 

 

Automatic Tests                                                                          

The unit will automatically initiate a self-test/self-diagnostic 
cycle based on the following table: 
 

 

 

 

 

Testing Period 

Duration of Test 

Once a month 

1 minute 

Once every 6 

months 

Alternating:  
30 minutes or 60 minutes 

 

 

 

 

 

Manual Tests                                                                           

Using the unit test switch, users can initiate different 
duration test cycles based on the following table: 

 

 

 

 

 

Initiating Action 

Test Cycle 

Press test switch once 

1 minute 

Press test switch twice 

90 minutes 
 

 
Pressing the test switch any time after a 90 min. test 

cycle has begun cancels the remainder of the 90 min. test 
and returns the unit to normal operation. 

 

 

 

 

 

  Red Status LED Code 

  Description 

  One blink ON/pause 

  Battery disconnected 

  Two blinks ON/pause 

  Battery fault 

  Three blinks ON/pause 

  Charger fault 

  Four blinks ON/pause 

  LED Driver fault 

  Five blinks ON/pause 

  Lamp fault 

Red/Green alternating 

  Load Learn in Process 

in the pattern listed in the following table: 

  Red Status LED Code 

  Description 

  One blink ON/pause 

  Battery disconnected 

  Two blinks ON/pause 

  Battery fault 

  Three blinks ON/pause 

  Charger fault 

  Four blinks ON/pause 

  LED Driver fault 

  Five blinks ON/pause 

  Lamp fault 

Red/Green alternating 

  Load Learn in Process 

93034795

93035762

93034797

 

The Spectron optioned EV4DI requires a load learn process at

installation. Press and hold the test button for more than 

 
 

OPERATION 

 

      

** 

** 

5 seconds to initiate the load learn.

Note: After clearing a 5 blink lamp fault by initiating a load 
learn test, a 60 second manual test must be initiated.