![Huazheng HZNZ-100 Manual Download Page 10](http://html.mh-extra.com/html/huazheng/hznz-100/hznz-100_manual_2179951010.webp)
7
whole battery group test was not finished when return but want to go on test click “Test
battery” the test will be continued as per last test.
Sixth step: data check :
“Data Mgmt” Select certain files and click “View” We’ll find
detail data.
Seventh step: Generation of report:
Print test report. External storage. SD card
can transfer data to computer by card reader. Just open the software in the computer
will be ok. If it’s internal storage click “Data Mgmt” and click “Exp ALL” the data will be
transferred to SD card. Then repeat first operation we’ll read all information.
3.2 Test parameters setting
Fig.3.2 Instrument main interface
Specification setting: Set specifications of battery to be tested.
Test battery: Continue test of last un-finished battery group.
Data: management: Check and analyze test data.
System management: Including time setting, touch accuracy calibration, reference
internal resistance maintenance, etc.
3.2.1 New battery specification setting
Main interface”
” —“
” enter into parameters setting interface .