12
Figure 10
Test confirmation interface
Click OK to start the up-current test. Please confirm that the test line has been connected.
At this time, the ground network test interface will appear (Figure 11). Click Cancel, and
the instrument will return to the startup interface (Figure 5).
Figure 11 Ground network test interface
I=2.000A Instantaneous current during the test.
U=0.151V Instantaneous voltage during test.
R=0.075Ω instantaneous impedance during testing. F=55.00Hz constant current source
frequency (double frequency conversion F1)
F=45.00Hz constant current source frequency (double frequency conversion F2)
Progress: 84% means 84% of the test is completed, etc.
To 100% test is completed.
After the test is completed, the ground network test result interface appears (Figure 12)
Summary of Contents for HZDW-DB
Page 27: ...25...