12
3. Installation drawing
4. Operation instruction
4.1
Turn on the machine after installation and connection well, the current digital
meter should on.
4.2
Put the “gas check/cutting” switch on gas check position, the air pump on,
check the air flow reach the cutting requirements, turn the switch to cutting
position.
4.3
Keep the nozzle on the vertical position of the work piece and suitable
distance away from work piece, cutting from the edge of the work piece. Press
the cutting torch switch, air pump work, compress air come out from the
nozzle, pre flow the air, HF start, arc strike success, then torch start to
working.
Installation and Operation
Maintenance and repair
Summary of Contents for LGK-240P
Page 1: ...LGK 240P INVERTER AIR PLASMA CUTTING MACHINE...
Page 2: ...1 2 3 IP21S 4 5 A...
Page 3: ...1...
Page 4: ...2 3 4...
Page 5: ...5 6 7...
Page 6: ...8 1 2 3 4 5 9...
Page 7: ...10 80...
Page 8: ...1 4 4 4 5 7 8 8 9 11 12 12 13 14 1 15...
Page 9: ...1...
Page 10: ...2 60 10 6 4...
Page 11: ...3 1 2 20 90 40 50 3 10 40 4 5 30cm 30cm 6 1000m...
Page 12: ...4 L G K 2 40 P 40A 220V IGBT GB T 15579 1 2013 GB T8118 2010...
Page 14: ...6 2...
Page 15: ...7 IGBT 40KHz PWM IGBT AC AC DC PI IGBT AC DC...
Page 16: ...8 1 2 3 4 5 6 7 8 9 AC220 10 1 2 4 5 6 7 8 9 10 3...
Page 17: ...9 1 2 3 4 1 2 3 4 IP21S 5 15 1...
Page 18: ...10 6 6mm2 7 6mm2 8 9...
Page 19: ...11 10 1 2 3 220VAC 220VAC...
Page 20: ...12 6...
Page 21: ...13 1 1 2 1 2 2 1 2 3 1 2 3 3 1 1 4 1 2 3 4 5 1 2 3 4 5 5 1 2 1 2...
Page 22: ...14 1 1 2 1 3 1 4 1...
Page 23: ...15 1...
Page 24: ...LGK 240P INVERTER AIR PLASMA CUTTING MACHINE...
Page 38: ...6 2 Cutting capacity Technical specifications...
Page 48: ...16 Electric Diagram...
Page 49: ...17...