
CONTENT
1.4 Working condition and environment
...................................................................................................1
4.3 Welder and wire feeder connection
4.4 Gas cylinder and gas regulator connection
......................................................................................... 9
5.1 Pr-operation and inspection confirmed items and methods and requirements
................................9
Preparation of safety equipment
...................................................................................................9
Switch operation and gas flow adjustment
................................................................................. 11
4-Step weld operation(Non initial)
..............................................................................................13
2-Step weld operation (Non initial and crater)
........................................................................... 14