2.3  Battery Connection

2.3.1  Battery Power Cable Connection

Note: for lead acid battery, the recommended charge current is 0.2C( C to battery capacity)

1.  Please follow below steps to implement battery connection:

2.  Assemble battery ring terminal based on recommended battery cable and terminal size.

3. Connect all battery packs as units requires. It's suggested to connect at least 200Ah capacity battery 

for HYL-5000 .

4. Insert the ring terminal of battery cable flatly into battery connector of inverter and make sure the bolts 

are tightened with torque of 2 ~3Nm. Make sure polarity of the battery  is correctly connected and ring 

terminals are tightly screwed to the battery terminals.

2.3.2  Lithium Battery Connection

If choosing lithium battery for HYL-5000, please make sure the battery BMS is compatible with 

Huayu inverter. Please check the compatible list in the Huayu website.

Please follow below steps to implement lithium battery connection:

1.  Connect power cable between inverter and battery

2.  Connect the CAN or RS485 communication cable between inverter and battery. If you do not get 

the communication cable from inverter manufacturer or battery manufacturer, please make the cable 

according to the PIN definition

3. Lithium battery configuration, in order to 

communicate with battery BMS, you should 

set the battery type to “Li-ion” in Program 

“03” by LCD and choose the right battery 

brand (for details, please check the LCD 

setting chapter), users can also choose the 

battery type and brand by monitor system. 

Pin

1 2 3 4 5 6 7 8

Pin

1

2

3

4

RS 485B

CANL

CANH

5/6

RS 485 port

CAN port

RS 485A

7/8

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

07

08

1 2 3 4 5 6

MPPT485

NTC

Parallel

Battery Pack

Inverter

2.2  Mounting the Unit

Consider the following points before selecting where to install:

Mount on a solid surface

Do not mount the inverter on flammable construction materials.

For proper air circulation to dissipate heat, allow a clearance of approx. 20 cm to the side and approx. 

50 cm above and below the unit.

The ambient temperature should be between 0°C and 55°C to ensure optimal operation.

The recommended installation position is to be adhered to the wall vertically.

180 mm

5

1

9 m

m

Step1. 

Use the wall-mounting bracket as the template to mark the position of the 4 holes, then drill 8 mm 

holes and make sure the depth of the holes is deeper than 50mm.

Step2. 

Install the expansion tubes into the holes and tight them, then use the expansion screws (packaged 

together with the expansion tubes) to install and fix the wall-mounting bracket on the wall.

Step3.

 Install the inverter on the wall-mounting bracket and lock the inverter using the security screws.

200mm

200mm

5

0

0

m

m

5

0

0

m

m

Steps to mounting the unit

Notice:

Summary of Contents for HYL-3000

Page 1: ...USER MANUAL Huayu Entry Level Hybrid Solar Inverter HYL 3000 HYL 4000 HYL 5000 www huayu solar com info huayu energy com Huayu Ningbo New Energy Technologies Co Ltd For Our Home Energy Independence...

Page 2: ...Connection 2 5 PV Connection 2 7 Dry Contact Signal Control 2 9 Power ON OFF 4 LCD Display and Settings 2 8 Parallel Function 5 Monitor System 3 Working Modes 7 Trouble Shooting Error List 6 Specifica...

Page 3: ...any maintenance or cleaning turning off the unit will not reduce this risk CAUTION To reduce risk of injury charge only deep cycle lead acid type rechargeable batteries and lithium batteries other ty...

Page 4: ...if not installed immediately refer to below figure a The inverter and its components must be stored in its original packaging b The storage temperature should be within 25 60 and humidity within 0 85...

Page 5: ...AC output GEN cable size for each inverter Model Gauge Cable mm2 Torque Value 3 PV Connection Please install separately a DC circuit breaker between inverter and PV modules The recommended of DC brea...

Page 6: ...tery configuration in order to communicate with battery BMS you should set the battery type to Li ion in Program 03 by LCD and choose the right battery brand for details please check the LCD setting c...

Page 7: ...tput Connection CAUTION There are two terminal blocks with IN and OUT markings Please do NOT mis connect input and output connectors Please follow below steps to implement AC input output connection 1...

Page 8: ...r battery charging reaches floating stage Battery voltage Low DC warning voltage Battery voltage Setting value or battery charging reaches floating stage NO2 COM2 NC2 COM2 Close Open Close Open Close...

Page 9: ...m For more detailed guidance for paralleling system please visit https www huayu solar com download And download the guidance Monitor Data Overview Maintain Stations Overview Station Name Serial numbe...

Page 10: ...st power from PV can feed in Grid PV BAT Grid On PV Battery power the load and the AC can power the load if PV Battery power not enough PV Grid On PV power the load the rest power feed in Grid PV Char...

Page 11: ...Mode 1 charge first AC charge battery if solar power is not enough to charge battery and the battery voltage SOC is lower than AC start charge voltage SOC the AC will stop charging when the battery V...

Page 12: ...n AC Charge Start Battery SOC and will stop when Voltage is higher than AC Charge End Battery SOC And battery will not discharge during the setting time 19 20 PV AC Take Load Jointly Export to Grid En...

Page 13: ...V voltage Floating charging voltage Cut off voltage Discharge end voltage And display the voltage SOC and power in turns of period of 1 seconds System working status setting code There are three type...

Page 14: ...dc DC source input There are four buttons on the LCD Step for settings by the display Step1 After touching enter button for about 2 seconds the unit will enter setting mode The setting icon and index...

Page 15: ...Battery Step1 Choose battery type first when Li ion flashing select Enter to choose Li ion battery Step2 Choose battery brand 0 Standard Battery 2 Pylon Battery 6 Huayu Protocol Battery 8 Dyness Batte...

Page 16: ...ource AC Input to take Load time setting Setting time of 1 start Range 00 00 23 59 Default 00 00 00 00 Setting time of 1 end Range 00 00 23 59 Default 00 00 00 00 Similar to set time 2 and time3 15 st...

Page 17: ...Enable 16 19 20 PV Off Grid enable disable Setting Range PV Off Grid Enable default PV Off Grid Disable Green Function enable disable Setting Range Green Function Disable default Green Function Enable...

Page 18: ...P store Scan two code bar to download the APP INVERTER MODEL HYL 5000 HYL 4000 HYL 3000 Input Voltage Waveform Sinusoidal utility or generator Nominal Input Voltage 230Vac Low Loss Voltage 170Vac 7V U...

Page 19: ...ow DC Warning Voltage Different load 2V load 20 20 load 50 load 50 42 0Vdc Settable Cut off Voltage load 20 1 2V Cut off Voltage load 20 3 6V Low DC Warning Return SOC 15 SOC Grid off settable Low DC...

Page 20: ...part there should be one master in the system CAN communication error in parallel system Check parallel setting for master Slave part there should be one master in the system No master in parallel sys...

Reviews: