Please prepare the breakers and cables in advanced before installation.
1.
Battery Connection
: For safety operation and regulation compliance, it's requested to install a separate
DC over-current protector or disconnect device between battery and inverter. The recommend battery
capacity is 150AH-200AH, the recommended spec of DC breaker is 150A/60V. Recommended battery cable
and terminal size:
Model
Maximum
Amperage
Cable
Battery
Capacity
Wire Size
Ring Terminal
Torque Value
Dimensions
2.
AC Connection
: Please install a separate AC breaker between inverter and AC input power source,
inverter and AC output load. This will ensure the inverter can be securely disconnected during maintenance
and fully protected from over current of AC input. The recommended spec of AC breaker is 32A.
Recommended AC input/ AC output /GEN cable size for each inverter.
Model
Gauge
Cable (mm2)
Torque Value
3.
PV Connection
: Please install separately a DC circuit breaker between inverter and PV modules.
The recommended of DC breaker is 600V/20A. It's very important for system safety and efficient
operation to use appropriate cable for PV module connection. To reduce risk of injury, please use the
proper recommended cable size as below:
4. Before connecting all wiring, please take off bottom cover by removing 3 screws as shown below.
HYL-5000
110A
200AH
1*2AWG
2*6AWG
38
28
6.4
6.4
39.2
33.2
D (mm) L (mm)
2~ 3 Nm
mm2
HYL-5000
10AWG
6
1.2 Nm
Model
Gauge
Cable (mm2)
Torque Value
HYL-5000
1x12AWG
4
1.2 Nm
05
06
2. Installation
2.1 Preparation
The system connection is as below:
Grid
EPS
LOAD
G
Generater
600V, 2*10AWG
600V, 2*10AWG
600V, 4*12AWG
1
0
0
V
, 2
*
4
A
W
G
M
A
X
:1
4
0
A
PE
QF 1
QF 1
QF 1
L
N
PE
L
N
PE
L
N
QF 3
PV
BAT
GEN
AC Output
AC Input
QF 2
QF 2 is Double Interlock Switch or Dual Power Switch In
≥
63A
QF 1 In
≥
63A
QF 2 In
≥
63A
QF 3 In
≥
140A