background image

D. Corner-mounted Installation/ 角装

Device Installation/ 设备安装

2

E. Wall-Mounted and Ceiling-Mounted Installations/ 壁装或吊装

Place the mount in the desired installation position. 
Use a marker to mark where the installation screws go. 
Use a 10 mm bit to drill the holes to a depth of about 
80 mm. Use a hammer to carefully drive the expansion 
bolts into the holes. Then, remove the washers, the 
spring washers, and the nuts from the expansion bolts.
将支架放置于安装位置 , 使用记号笔绘制螺钉安装位置,再
选择直径为 10mm 的钻头,钻取深约 80mm 的导孔。使用
羊角锤将膨胀螺栓打入钻好的孔内。 再将平垫、弹垫和螺母
拧下。

Remove washers, spring washers, and nuts from the 
expansion bolts and thread the cables through the 
wall mount. Put the four expansion bolts through 
the  four  screw  holes  at  the  bottom  of  the  wall 
mount, replace the washers, spring washers, and 
nuts on the expansion bolts, and tighten the nuts.
拧下膨胀螺栓上的平垫、弹垫和螺母。将需要与球机尾线
对接的线缆穿过壁装支架。将角装支架底座上的 4 个螺孔
套在相应的膨胀螺栓上,将平垫、弹垫和螺母套在膨胀螺
栓上,拧紧螺母。

3

5

Align the screw holes on the wall mount with 
the screw holes on the pole mount, and fasten 
them together using the M8 screws.
将角装支架上的螺孔与抱装支架上相应的螺孔对齐,
拧紧 M8 螺钉。

1

NOTE/ 说明

For details about subsequent 
installation operations, see 3 to 
5 in 

Pole-mounted Installation

.

后续安装的具体过程请参见“立杆
抱装中的步骤3到步骤5”。

2

1

Remove washers, spring washers, and nuts from the expansion bolts, and thread the cables through the mount. 
Put the four expansion bolts through the four screw holes on the base of the mount, replace the washers, 
spring washers, and nuts on the expansion bolts, and tighten the nuts.
拧下膨胀螺栓上的平垫、弹垫和螺母。将需要与球机尾线对接的线缆穿过壁装 / 吊装支架。将壁装 / 吊装支架底座上的 4
个螺孔套在相应的膨胀螺栓上,将平垫、弹垫和螺母套在膨胀螺栓上,拧紧螺母。

NOTE/ 说明

For details about subsequent installation 
operations, see 3 to 5 in 

Pole-mounted 

Installation

.

后续安装的具体过程请参见“立杆抱装中的
步骤3到步骤5”。

wall-mounted/ 壁装

ceiling-mounted/ 吊装

wall-mounted/ 壁装

ceiling-mounted/ 吊装

Place the mount in the desired installation position. Use a marker to mark the screw installation locations. 
Select a drill bit with a diameter of 10 mm to drill holes with a depth of about 80 mm. Use a claw hammer to 
install the expansion bolts into the holes. Then, screw off the flat washers, spring washers, and nuts from the 
expansion bolts.
将支架放置于安装位置 , 使用记号笔绘制螺钉安装位置。再选择直径为 10mm 的钻头,钻取深约 80mm 的导孔。使用羊
角锤将膨胀螺栓打入钻好的孔内。 再将平垫、弹垫和螺母拧下。

Summary of Contents for X6621-Z30

Page 1: ...ly applies to products operating under the conditions specified in their corresponding product manuals 本产品的环保使用期限为20 年 标识如左图所示 某些可更换的零部件会有一个不同的环保使用期贴在其 产品上 此环保使用期限只适用于产品是在产品手册中所规定的条件下工作 1 Default Login IP Adresse IP IP accesso predefinito 默认 IP 地址 User Name nom d utilisateur nome utente 用户名 192 168 0 120 admin Huawei Enterprise Technical Support APP 华为企业技术支持 APP To obtain the latest documents incl...

Page 2: ...输入接口 支持AC24V 25 24 9 电源输入 2 LAN 10M 100 1000M adaptive network port supporting PoE power supply 10 100 1000M自适应网络接口 同时还支持POE 供电 3 8 SFP_RX SFP_ TX Fiber optic interface This interface supports FC connection to an external fiber optic connection or LC connection to an internal fiber optic connection During single fiber bidirectional transmission ensure that the SFP optical module LC interface and t...

Page 3: ... interference needs to be avoided 禁止私自拆解球机 安装完成前切勿撕下镜头保护膜 安装此设备的立杆 天花板 墙壁和支架 需确保在承重15Kg时稳定 性较好 并确保各安装环境的牢固 可靠 同时 应避免球机附近存在磁场干扰 CAUTION 注意 Use a hex key to loosen cover screws hold down the fastener buttons on the side of the camera and open the cover Insert an SFP optical module into the SFP interface and connect an optical fiber LC properly to the SFP optical module 用内六角扳手拧开顶盖螺丝 按下摄像机侧面的 2 个卡扣按钮 ...

Page 4: ...roofing and insulation procedures see Cable Connection and Waterproofing and Insulation 连接线缆和防水 绝缘处理 参见 连接线缆和防水绝缘处理 After the installation verify that the protective film on the lens has been removed Remove the fixing rubber strip from the camera body 安装完成后 请检查镜头保护膜 确认已撕掉镜头上的保护膜 撕掉机身的固定胶条 3 Device Installation 设备安装 C Pole Mounted Installation 立杆抱装 C Pole Mounted Installation 立杆抱装 4 C Pole Mounted ...

Page 5: ...them together using the M8 screws 将角装支架上的螺孔与抱装支架上相应的螺孔对齐 拧紧 M8 螺钉 1 NOTE 说明 For details about subsequent installation operations see 3 to 5 in Pole mounted Installation 后续安装的具体过程请参见 立杆 抱装中的步骤3到步骤5 2 1 Remove washers spring washers and nuts from the expansion bolts and thread the cables through the mount Put the four expansion bolts through the four screw holes on the base of the mount replace the ...

Page 6: ...terproofing tape evenly to twice its original length Then apply it for three layers from bottom to top from top to bottom and from bottom to top again 用绝缘胶带缠绕每条线缆对接处 缠绕一层 均匀拉伸防水胶带 使其长度为原长度的 2 倍 再采用由下至上 由上至下 再由下 至上的处理方式缠绕三层 Apply three layers of insulation tape Then use cable ties to secure the both ends 用绝缘胶带缠绕三层 最后用扎线带绑扎上下两端 Cover the rest of the cabling in a conduit or with protective waterproof...

Page 7: ...orm assigns to the camera The value of this parameter must be the same as the first 20 digits in the device ID the value of Code on the IVS platform configured on the video surveillance platform If they are different the camera will be unable to connect the video surveillance platform 监控平台分配给前端设备的唯一标识 必须与平台配置的设备ID 在IVS平台中 该参数名为编码 的前20位保 持一致 以免造成对接失败 Login name 登录名 User name used to register the ca...

Page 8: ...meters you can set platform connection parameters 选择 高级配置 网络 平台对接参数 可以配置摄像机和视频监控平台对接参数 Set the platform connection parameters based on your network plan 根据规划的数据配置平台对接参数 For detail about how to set platform connection parameters see Configuration Guide 平台对接参数的具体配置方式请参见 配置指南 Platform Connection Settings 配置平台对接参数 The default coding protocol of IPCs is H 265 Verify that the connected surveillance plat...

Page 9: ...ogies Co Ltd Huawei To be entitled for warranty service for the product please read the following warranty statements carefully 1 Warranty Period Unless otherwise stated specifically by Huawei the following periods apply Duration of Hardware Warranty 12 months Duration of Software Media 3 months The start date of the warranty The warranty starts on the 90th day after the date of the product shipme...

Page 10: ...n of the structure security or performance 未经授权 任何单位和个人不得对设备进行结构 安全和性能方面的改动 Installation and maintenance must be performed by professional technical engineers or system installation engineers 有关本装置的所有安装维修工作均应由专业的维修技术人员或系统安装人员来完成 Use product attached auxiliaries and recommended fittings 请使用产品配套的附件以及厂商推荐的配件 Please use the handle instead of the pigtails to carry the camera 设备搬运的时候通过提手搬运 不允许通过提尾线搬运设备 ...

Reviews: