background image

Figures

Figure 2-1

 Logical structure of a BTS..................................................................................................................2-2

Figure 2-2

 Site Maintenance Terminal System Software Window......................................................................2-3

Figure 3-1

 Site Maintenance Terminal system window.......................................................................................3-5

Figure 3-2

 Communication failed dialog box......................................................................................................3-5

Figure 3-3

 Set Communication Port Parameter dialog box.................................................................................3-6

Figure 4-1

 Site Management Right dialog box....................................................................................................4-3

Figure 5-1

 

Site Configuration

 dialog box (1).....................................................................................................5-4

Figure 5-2

 

Site Configuration

 dialog box (2).....................................................................................................5-5

Figure 5-3

 

Site Configuration

 dialog box (3).....................................................................................................5-6

Figure 5-4

 

Site Configuration

 dialog box (4).....................................................................................................5-7

Figure 5-5

 

Site Configuration

 dialog box (5).....................................................................................................5-8

Figure 5-6

 User Error dialog box.........................................................................................................................5-9

Figure 5-7

 

Site Configuration

 dialog box (6)...................................................................................................5-10

Figure 5-8

 Configured cell and channels............................................................................................................5-11

Figure 5-9

 

Site Opstart

 dialog box...................................................................................................................5-12

Figure 5-10

 

Cell Opstart

 dialog box.................................................................................................................5-12

Figure 5-11

 Site Opstart dialog box...................................................................................................................5-13

Figure 5-12

 View Resource dialog box..............................................................................................................5-14

Figure 5-13

 Software Download dialog box......................................................................................................5-16

Figure 5-14

 Software Activation dialog box......................................................................................................5-18

Figure 5-15

 Software Activation dialog box......................................................................................................5-18

Figure 5-16

 Site Reset Hierarchically dialog box..............................................................................................5-20

Figure 5-17

 Site Test dialog box........................................................................................................................5-21

Figure 5-18

 Environment Monitor dialog box...................................................................................................5-23

Figure 5-19

 Board Management window...........................................................................................................5-24

Figure 5-20

 Get BTS Compressed Log dialog box............................................................................................5-25

Figure 5-21

 View BTS Log dialog box..............................................................................................................5-26

Figure 5-22

 Transmission Performance Test dialog box...................................................................................5-28

Figure 5-23

 Query Warn Delay Time dialog box..............................................................................................5-29

Figure 5-24

 Ring Topology Parameter Query dialog box..................................................................................5-30

Figure 5-25

 Bar Code Query dialog box............................................................................................................5-31

Figure 5-26

 RET Antenna Manage dialog box..................................................................................................5-32

Figure 5-27

 Configuring PPP links....................................................................................................................5-35

DBS3900 GSM
Site Maintenance Terminal User Guide

Figures

Issue 02 (2011-03-30)

Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

xiii

Summary of Contents for V100R012

Page 1: ...DBS3900 GSM V100R012 Site Maintenance Terminal User Guide Issue 02 Date 2011 03 30 HUAWEI TECHNOLOGIES CO LTD ...

Page 2: ......

Page 3: ...be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject to change without notice Every effort has been made in the preparation of this document to ensu...

Page 4: ......

Page 5: ...Audience This guide is intended for the engineers who maintain the BTS through the site maintenance terminal The engineers should have the basic knowledge of radio communications IP windows operations and BTS This document is intended for l System engineers l Field engineers l Shift operators l Network operators Organization 1 Changes in DBS3900 GSM Site Maintenance Terminal User Guide This provid...

Page 6: ... and cell extended attributes testing all the BTs and RCs of a cell so that they can be locked or unlocked and checking whether the BTs and RCs are functional 7 Managing BTs The BT management involves locking or unlocking a BT resetting a BT performing the RC self test view the status of the channels on a specified BT and enabling a specified RC to transmit signals at a predefined power level 8 Ma...

Page 7: ...h if not avoided could result in equipment damage data loss performance degradation or unexpected results Indicates a tip that may help you solve a problem or save time Provides additional information to emphasize or supplement important points of the main text General Conventions The general conventions that may be found in this document are defined as follows Convention Description Times New Rom...

Page 8: ...defined as follows Convention Description Boldface Buttons menus parameters tabs window and dialog titles are in boldface For example click OK Multi level menus are in boldface and separated by the signs For example choose File Create Folder Keyboard Operations The keyboard operations that may be found in this document are defined as follows Format Description Key Press the key For example press E...

Page 9: ...y mouse button twice continuously and quickly without moving the pointer Drag Press and hold the primary mouse button and move the pointer to a certain position DBS3900 GSM Site Maintenance Terminal User Guide About This Document Issue 02 2011 03 30 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd vii ...

Page 10: ......

Page 11: ...e Local End 3 4 3 3 Exiting the Site Maintenance Terminal 3 6 4 Using the Site Management Rights 4 1 4 1 Site Management Rights 4 2 4 2 Obtaining the Site Management Rights 4 2 4 3 Releasing the Site Management Rights 4 2 5 Managing Sites 5 1 5 1 Performing the BTS Configuration 5 4 5 2 Performing Site Opstart 5 13 5 3 Viewing Site Resources 5 13 5 4 Forcibly Loading Software 5 14 5 5 Activating S...

Page 12: ...utes 6 5 6 3 Performing Cell Opstart 6 7 6 4 Changing the Cell Management State 6 7 6 5 Performing the Cell Performance Test 6 9 7 Managing BTs 7 1 7 1 Performing BT Opstart 7 2 7 2 Changing the BT Management State 7 2 7 3 Re Initializing a BT 7 4 7 4 Performing Baseband Test 7 5 7 5 Viewing the Channel Status 7 7 7 6 Setting the TRX Full Power Emission 7 8 8 Managing RCs 8 1 8 1 Managing RC Attri...

Page 13: ... Extended Information 11 4 11 3 Resetting a Board in Power Off Mode 11 6 11 4 Resetting a board 11 8 11 5 Starting a Board 11 10 11 6 Testing a Board 11 12 11 7 Performing Loopback Test of Board Communication Links 11 14 11 8 Querying Board Parameters 11 16 11 9 Querying Port Attributes 11 21 11 10 Setting the Receive and Send Mode 11 23 12 RRU Configurations 12 1 12 1 Adding an RRU 12 3 12 2 Dele...

Page 14: ......

Page 15: ...og box 5 12 Figure 5 11 Site Opstart dialog box 5 13 Figure 5 12 View Resource dialog box 5 14 Figure 5 13 Software Download dialog box 5 16 Figure 5 14 Software Activation dialog box 5 18 Figure 5 15 Software Activation dialog box 5 18 Figure 5 16 Site Reset Hierarchically dialog box 5 20 Figure 5 17 Site Test dialog box 5 21 Figure 5 18 Environment Monitor dialog box 5 23 Figure 5 19 Board Manag...

Page 16: ...gement dialog box 6 5 Figure 6 2 Cell Extended Attributes Management dialog box 6 6 Figure 6 3 Cell Opstart dialog box 6 7 Figure 6 4 Change Cell Management State dialog box 6 8 Figure 6 5 Cell Test dialog box 6 9 Figure 7 1 BT Opstart dialog box 7 2 Figure 7 2 Change BT Management State dialog box 7 3 Figure 7 3 BT Reinitialization dialog box 7 4 Figure 7 4 BIU loop test 7 5 Figure 7 5 TRX self t...

Page 17: ...window 11 9 Figure 11 9 Selecting Reset 11 9 Figure 11 10 Board Reset window 11 10 Figure 11 11 Reset dialog box 11 10 Figure 11 12 Topology Management window 11 11 Figure 11 13 Choosing Opstart 11 11 Figure 11 14 Topology Management window 11 12 Figure 11 15 Choosing Test 11 13 Figure 11 16 Board Test dialog box 11 13 Figure 11 17 Topology Management window 11 15 Figure 11 18 Selecting Loop Test ...

Page 18: ...ure 12 9 Topology Configuration window 12 9 Figure 12 10 Divide Ring window 12 9 Figure 12 11 Board Management window 12 11 Figure 12 12 Topology Management window 12 12 Figure 12 13 On Site Topology Management window 12 13 Figure 12 14 Topology Management window 12 14 Figure 12 15 Shortcut menu for set BreakPoint 12 14 Figure 12 16 Topology Management window 12 15 Figure 12 17 Shortcut menu for c...

Page 19: ...og box 5 60 Table 5 10 Parameters in the Software Activation dialog box 5 62 Table 6 1 Parameters in the Cell Attributes Management dialog box 6 2 Table 6 2 Parameters in the Cell Extended Attributes Management dialog box 6 6 Table 8 1 Parameters in the RC Attributes Management dialog box 8 2 Table 8 2 Parameters in the RC Extended Attribute Management dialog box 8 3 Table 9 1 Parameters in the Ch...

Page 20: ......

Reviews: