Figure 3-28
Installing a riser card tray (2)
Step 10
Install the chassis cover. For details, see
3.5 Installing the Chassis Cover
Step 11
Install the server. For details, see
4.4 Installing the Server on Guide Rails
.
Step 12
Connect the power cables. For details, see
Step 13
Power on the server. For details, see
Step 14
Log in to the iBMC WebUI, and check whether the new component is normal. For details, see
the
Huawei Rack Server iBMC User Guide
----End
2288H V5 Server
User Guide
3 Basic Operations
Issue 04 (2018-09-04)
Copyright © Huawei Technologies Co., Ltd.
66