UPS5000-H-400 kVA & 800 kVA-NTN Quick Guide (Singapore 1-NET, 100 kVA Power Modules)
01
Installing Cabinets
安装流程
1
Installing Cabinets
(
400 kVA
)
Cabinet Description
Rectifiers
Fan power switch QS
Main switch QF of
the inductor cabinet
风扇
Power distribution
cover
功率模块
UPS
cabinet
Inductor
cabinet
Issue: 01
Date: 2021-07-14
1. Before installation, read the user manual carefully to get familiar with product information and safety precautions.
2. Use insulated tools when installing the equipment.
3. Only engineers certified by Huawei or its agent are allowed to install, commission, and maintain the UPS. Otherwise, personal injury or equipment damage
may occur, and the resulting UPS faults are beyond the warranty scope of Huawei.
4. This document describes the installation procedure for a single UPS. For details about how to install a parallel system, contact Huawei technical support.
Model
Weight
Dimensions (H x W x D)
UPS5000-H-400K-NTN
UPS cabinet: < 800 kg
Inductor cabinet: < 550 kg
UPS cabinet: 2000 mm x 800 mm x 1000 mm
Inductor cabinet: 2000 mm x 400 mm x 1000 mm
UPS5000-H-800K-NTN
UPS cabinet: < 1300 kg
Inductor cabinet: < 550 kg
UPS cabinet: 2000 mm x 1600 mm x 1000 mm
Inductor cabinet: 2000 mm x 400 mm x 1000 mm
Unpacking
Securing the
Cabinet
Space Planning
M12 bolt
Spring washer
Flat washer
Expansion sleeve
Expansion nut
Concrete floor
Control module
Bypass modules
Power modules
Fans
UPS
cabinet
Inductor
cabinet
PSU for fans