UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
3 Installation
Issue 02 (2017-02-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
121
Figure 3-88
Connecting signal cables in a dual-bus system
Step 2
Connect signal cables for each UPS by referring to
----End
3.4 Installation Verification
If the check results of listed items 10 and 11 in
do not meet the acceptance criteria,
the UPS may be damaged.
Table 3-9
Installation checklist
No.
Item
Acceptance Criteria
01
Consistency between system
configurations and delivery
configurations
The system configurations, including
models and the number of modules, comply
with the contract.