![Huawei SUN2000-(25KTL, 30KTL)-US User Manual Download Page 60](http://html.mh-extra.com/html/huawei/sun2000-25ktl-30ktl-us/sun2000-25ktl-30ktl-us_user-manual_168462060.webp)
SUN2000-(25KTL, 30KTL)-US
User Manual
5 Electrical Connections
Issue 03 (2017-04-01)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
54
Procedure
Step 1
Prepare OT terminals.
Figure 5-5
Stripped length
Figure 5-6
Crimping a cable
The cavity formed after the conductor crimp strip is crimped must wrap the core wires completely. The
core wires must contact the terminal closely.
Step 2
Route the prepared cable through the GND and AC OUTPUT cable holes, and tighten the
screw using a torque screwdriver.
If cables are routed through a pipe, you can secure the pipe after connecting the ground cable to ground
point 4 and connecting the AC output power cable.