![Huawei SUN2000-(25KTL, 30KTL)-US User Manual Download Page 45](http://html.mh-extra.com/html/huawei/sun2000-25ktl-30ktl-us/sun2000-25ktl-30ktl-us_user-manual_168462045.webp)
SUN2000-(25KTL, 30KTL)-US
User Manual
4 Installation
Issue 03 (2017-04-01)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
39
Figure 4-22
Rear panel dimensions
Procedure
Step 1
Determine the positions for drilling holes (as shown in
Figure 4-23
) using the rear panel
available in the packing case, level the hole positions using a level, and mark the hole
positions using a marker.
Figure 4-23
Determining hole positions
Step 2
Drill holes using a hammer drill, as shown in
Figure 4-24
.