![Huawei Quidway S5600 Installation Manual Download Page 45](http://html.mh-extra.com/html/huawei/quidway-s5600/quidway-s5600_installation-manual_169840045.webp)
Installation Manual
Quidway S5600 Series Ethernet Switches
Chapter 3 Installing the Switch
Huawei Technologies Proprietary
3-9
PE wire is well connected to the ground at the power distribution room or AC
transformer side.
(4)
(2)
(1)
(5)
(3)
(6)
(4)
(2)
(1)
(5)
(3)
(6)
(1) AC-input
(2) Grounding screw
(3) Power transformer
(4) PE wire
(5) AC-input (with 3-wire cable)
(6) Ethernet switch
Figure 3-13
Grounding through the AC PE wire
z
For a DC-powered switch, if none of the first two conditions is available, ground it
through the return wire (RTN) of the DC power supply. In this case, make sure this
RTN wire is well connected to the ground at the DC output of the DC power
cabinet.
(1)
(2)
(4)
(3)
(6)
(5)
(7)
(8)
(9)
(11)
(10)
(1)
(2)
(4)
(3)
(6)
(5)
(7)
(8)
(8)
(9)
(9)
(11)
(10)
(1) AC/DC power cabinet (2) -48V strip
(3) -48V
(4) RTN strip
(5) RTN
(6) PGND strip
(7) Grounding
(8) Ground wire
(9) Grounding screw
(10) Ethernet switch
(11) DC-input
Figure 3-14
Grounding through the PGND of a power cabinet
3.4 Connecting the Switch to a Console Terminal
3.4.1 Console Cable
Console cable is an 8-core shielded cable. At one end of the cable is a crimped RJ-45
connector for the connection to the console port of the switch; at the other end of the