
Installation Manual
Quidway AR 46 Series Routers
Appendix A Installation of B68 Cabinet
A-23
(1) Bolt M12
×
60
(2) Spring washer
Φ
12
(3) Big flat washer
Φ
12
(4) Expansion tube
(5) Expansion nut
(6) Height-retaining bolt (both sides)
(7) Height-retaining bolt (middle)
(8) Height scale of antistatic floor
Figure A-26
Diagram of the connection between the rack and floor
Caution:
When fixing the rack in Figure B-26, fasten the middle high-retaining bolt first and then the side ones.
A.3.6 Install slide rail
I. Install T nut
Before the slide rail is installed, you should put the T nuts into the lower trough of the
slide rails. The T nuts are used to fix the slide rails, and the floor bracket fixing plate.
Each cabinet needs four T nuts in each of the slide rail (two of them are used for floor
bracket assemblies). Otherwise, after the slide rail is installed, the T nuts cannot be
installed. The outline of type T nut is shown in Figure B-27. There are four sets of floor
bracket fixing plates for each cabinet, two on each of the slide rail.