2
Preparations for Installation
Controller enclosure (4U)
Disk enclosure (2U)
Adjustable guide rails
Floating nut and M6 screw
Cable rack (2U)
Front panel of controller enclosure (4U)
Front panel of disk enclosure (2U)
The installation tools that the
customer needs to prepare include:
Phillips screwdriver (M3-M6)
Flat-head screwdriver (M3-M6)
Diagonal pliers
Floating nut mount bar
Multi-mode optical fibre
mini SAS cable
Network cable
Installation template (for 4U devices)
Installation template (for 2U devices)
The above table only includes part of the materials to be used during the installation. For information about all the
materials, see the
Packing List
.
To prevent other devices connected to the circuit breakers from being
incorrectly powered off due to a power supply failure of the storage device,
you are advised to ensure that the electric current of the circuit breakers of the
external power supplies to which the storage device is connected complies
with the following specifications:
Controller enclosure:
16 A (for AC power supplies)
Disk enclosure:
16 A (for AC power supplies)
1
Verifying Installation Tools
2
Verifying Circuit Breakers
3
Verifying Materials