4
Securing the Equipment
3.6
Installing Cabinets Side by Side
3.5
Front
Rear
Unit: mm
Pipe support
4
Installing Pipes
1. A 1:100 tilt should be reserved for the main drainpipe and humidifier water inlet pipe.
2. Keep a clearance of at least 25 mm between pipes. Secure the pipes to supports every a
certain distance.
3. Clean the water inlet engineering pipes to avoid impurities entering into the humidifier.
4. A reducing valve must be installed if the inlet water pressure exceeds 0.7 MPa.
5. Pipes should be wrapped with thermal insulation foam along the route.
Pipe Layout
4.1