DANGER
Do not operate equipment or cables during lightning strikes.
Installation Process
Safety Precautions
2
Scenario 1
Wear an ESD wrist strap inserted into
the ESD jack.
P4
P25
P8
P29
P43
P21
P45
P22
Ground a device before powering it on. Otherwise, personal injury or equipment damage may be caused
by high leakage current.
When installing equipment, ground it first. When removing equipment, disconnect grounding cables last.
Do not damage grounding conductors or operate the equipment without a grounding conductor.
Equipment must be permanently connected to the protection ground before an operation. Before operating
a device, check the electrical connection of the device and ensure that the device is securely grounded.
Scenario 2
Wear an ESD wrist strap connected
using a crocodile clip.
Preparation
Installation and cable connection
Power-on and power-off commissioning
Inspection before power-on